您要查找的是不是:
- bilge pump discharge pipe 舱底泵出水管
- The FLX-FF4 control check valve is primarily designed for installaton in pump discharge piping where it functions as a spring loaded silent check valve,balancing valve and shut-off valve. FF4控制止回阀在管路中连接在泵的输出端,可以替代泵输出端的消音止回阀、调节阀以及关断阀。
- Discharge pipe take pollutant away from the coastal area into the sea. 排泄管道将污染性物质由沿海岸区排入大海。
- Make sure pump discharge TRV in correct position. 确认泵出口管线TRV流程已通。
- air pump discharge pipe 气泵排气管
- circulating pump discharge pipe 循环水泵出水管
- Switch on bilge pumps in engine room and report. 启动机舱污水泵并报告。
- All bilge pumps are operational. 所有救生艇排水泵正常。
- Note: Preferred mounting of check valves of any manufacturer is 5 pipe diameters downstream from the pump discharge or pipe elbow. 注释:任何制造商的止回阀最好安装在泵排泄口或管道弯头下游5倍管道直径的位置。
- On passing into the discharge pipe,the steam condenses. 蒸汽一进入排气管就要冷却。
- On passing into the discharge pipe, the steam condenses. 蒸汽一进入排气管就要冷却。
- Operation test of emergency switching-off device for oil pump and ventilator (bilge pump) in engine room. 机舱风、油(舱底泵)应急切断装置操作试验。
- Switch over bilge pumps from port to starboard side. 将污水泵工作从左舷切换到右舷。
- CTC maximum head is suitable for pump discharge to Butanol handling facility. 用户确认泵出口去丁醇处理装置的最大扬程是合适的.
- Install 5 pipe diameters minimum downstream from pump discharge or elbows to avoid flow turbulence. Flow straighteners may be required in extreme cases. 安装在距离泵排泄口或弯管下游至少5倍管道直径的地方,以避免产生水流扰动。在极端情况下,可能需要流向矫直装置。
- Discharge pipe takes pollutant away from the coastal area into the sea. 排泄管道将污染性物质由沿海岸区排入大海。
- The next steps will be to route the receiver antenna outside the WTC, cut off the battery terminal poles and also figure out what to do with the bilge pump light. 接下来的步骤将是路线,接收天线以外的世台会,切断电池终端两极并计算出该怎么办与舱底泵轻。
- Do not undersize supply and discharge piping. 供应管道和排泄管道的口径不要太小。
- In order to reduce the fluctuation of pressure and discharge capacity of the triplex drilling pump,the air accumulator is often fixed on the discharge pipe. 为了降低三缸单作用钻井泵的压力和排量波动,通常在排出管线上安装有空气包。
- Mergency fire pump room was flooded with water, source of leaking and bilge pumping arrangement to be check in re-inspection. 船舶舱底排水不能正常进行。