- Allow for 20 service openings through the diaphragm wall. 有20个管线进线口穿过连续墙。
- Allow for20 service openings through the diaphragm wall. 有20个管线进线口穿过连续墙。
- In other words, soil creep may make significant contributions to diaphragm wall displacement and ground settlement in a deep excavation project in soft clay strata. 也就是说,对一个座落于粘土地层的深开挖工程而言,土壤潜变可能对壁体侧向变形及地表沈陷有显著的贡献。
- Abstract: This paper presents the application of cement soil piles for reinforcing shallow soft soil. 文摘:本文介绍水泥搅拌桩法在浅层软土地基加固的应用。
- Cement soil mixing pile plus anchor bolts is a new supporting technology for foundation pit . 水泥土搅拌桩加锚杆基坑围护结构是一种基坑支护新工艺。
- This paper presents the application of cement soil piles for reinforcing shallow soft soil. 本文介绍水泥搅拌桩法在浅层软土地基加固的应用。
- Besides, the length of linking slab must be optimized to improve the stress of the diaphragm wall. 另外,连接板的长度也需进行合理的优化设计。
- Reinforcement mechanism and strength influencing factor of cement soil pile of SMW engineering method are introduced. 介绍了SMW工法复合围护结构中的水泥土桩的加固机理、强度影响因素。
- Technique of building diaphragm wall by water jetting is a new technology in building underground continuous wall. 射水法造墙技术是建造地下连续墙的一种新的施工工艺。
- Artificial borehole diaphragm wall and reverse construction method are adopted according to the characteristics. 根据此特点,选择人工成孔地下连续墙逆作法施工。
- This paper introduces the joint application of high-pressure jet grouted piles and cement soil mixed piled for dealing with seepage of earth cofferdam for dry dock in Rizhao Port. 介绍高压喷射注浆和水泥土搅拌桩防渗加固技术在日照港干船坞土围堰防渗处理中的组合应用。
- Actual locations, together with sealing details and insert levels will be available before the diaphragm wall is to be placed. 在施工连续墙前,应留出管线进线位置及其密封口的实际位置。
- In this article,authors introduce the construction measures of underground diaphragm wall in Fujian Sanming plate swirling flow sedimentation tank. 描述了福建三明中厚板漩流池工程采用地下连续墙的施工方法,取得了较好的效果。
- Thus, an effective analytic way is provided for the calculation of obligating width of soil slope shoulder beside diaphragm walls in top-down construction method. 文章为逆作法盆式开挖施工中地下连续墙边预留土体坡肩宽度提供了一种有效的计算分析方法。
- The underground diaphragm wall in Yellow River Undercrossing Project of the Middle Route in the South-to-North Water Diversion is the deepest and thickest one in China. 南水北调中线穿黄工程地下连续墙是国内最深最厚的地下连续墙,地质条件差,施工难度大,施工中存在较大的风险。
- It solves the problem that traditional safty factor will deminish along with the augment of the structural depth in the dust, thus it can reflect the mechanism of resisting capsizing to cement soil supporting structure well. 克服了传统方法抗倾覆稳定安全系数会随着结构入土深度的增大反而减小的缺陷 ,因而能很好地反映水泥土支护结构抗倾覆的机理
- To study vertical bearing behavior of the foundation,a shaft diaphragm wall foundation of bridge in loess area was tested for bearing capacity by use of the self-balanced method. 为研究其竖向承载特性,在国内首次采用自平衡法对黄土地区某桥梁的井筒式地下连续墙基础进行了现场静载试验。
- The bearing capacity of the same specification cement soil mix stake and the concrete drill-holing stake, and the influence of staking length to the cement soil mix stake bearing capacity were tested. 摘要测试了相同规格刚芯水泥土搅拌桩和混凝土钻孔灌注桩的承载力,并研究了芯桩长度对刚芯水泥土搅拌桩承载力的影响。
- The diaphragm walling is usually cast in sections not exceeding 6 meters in length. 通常,地下连续墙分段施工每段长度一般不超过6米。
- Extruding parts, mortars and cement soils adhering on cement surface, oil and water, or too smooth surface should be removed or treated with abrader machines or bench grinders. 突出部分及附著于水泥面上之砂浆屑、泥土、水泥翻沫及油、水等杂物或表面极光滑者,均须以磨石机或砂轮机清除。