您要查找的是不是:
- Familiar with Engineering Change Control process. 熟练掌握工程更改控制流程。
- Work with the change control board. 变更控制委员会是审批变更的权力机构。
- Quality System Change Control Procedure. 质量体系的改变控制程序。
- C. Poor use of scope change control. 使用范围变更控制的技能差。
- Managed change control of a JD Edwards upgrade project. 软件升级项目中的转变控制。
- The Originator has submitted a new i ue to the change control system. 发起人向变更控制系统提交一个新的变更请求。
- Des the company have an effective design change control procedure in place? 该公司有有效的设计更改控制程序吗?
- The Originator has submitted a new issue to the change control system. 发起人向变更控制系统提交一个新的变更请求。
- C. Project plan development, overall change control, and scope change control. 项目计划制定,项目计划实施和范围变更控制。
- Anything that requires a change to be made immediately, bypassing the change control process temporarily. 任何需要立即实施的变更,可暂时绕过变更控制过程。
- In most application areas,the configuration management system includes the change control system. 在大多数应用领域,配置管理系统包含变更控制系统。
- The change control system is a subsystem of the configuration management system. 变更控制系统是配置管理系统的一个子系统。
- Another aspect of change control, in some systems, is the ability to keep track of the status of each change. 在一些系统中,变化控制的另一个方面是跟踪每个变化的状态的能力。
- Responsible for product design and development review, risk management and change control. 负责产品设计开发的评审,风险管理和更改控制。
- Manages the Non-Conforming issues, Corrective Actions/Preventive Action (CAPA), Change Control System. 处理未明问题,并执行更正/预防措施(CAPA),及变更控制系统。
- Develop and implement a system to manage change control, OOS's, deviations and product complaints. 开发及管理系统以处理变更控制、缺货、偏差状况及抱怨货品问题。
- This process results in a project management plan that is updated and revised through the Integrated Change Control process. 这一过程的结果使项目管理计划通过整体变更控制过程得以更新与修改。
- System Management: Any special requirements in terms of change control, for example, or other aspect of systems management. 系统管理:比如任何变更控制方面的特别需求,或者其他系统管理方面的需求。
- Templates could include work breakdown structure templates,scope management plan templates,and project scope change control forms. 样板可能包括工作分解结构样板、范围管理计划样板与项目范围变更控制表格。
- D. The project manager should create a change control from, and have the customer sign since the change is already made. 由于这项变更已经做了,因此项目经理应该做一份变更控制表并请客户在上面签字。