您要查找的是不是:
- Some experiences of the mill retrofit including equipment import,non-standard sets complement and commissioning test run in Guangzhou Paper Mill recent yeare are summarized in this paper. 结合近年来从事企业技术改造工作的实例,总结了从设备引进、非标配套、新老系统或设备的衔接,直到实物试车全过程的一些经验、教训和体会。
- Code for commissioning test run of chemical large and medium plant 化学工业大、中型装置试车工作规范
- Experiences in Commissioning Test Run of Aluminum Strip Hot Rolling Mill 铝带材热轧机负荷试车的几点体会
- Experiences of the Mill Retrofit: Equipment Import, Complement and Commissioning Test Run 技改设备的引进、配套和试运行
- A test run would be useful to the statisticians. 试运转将对统计学家有用。
- commissioning test run 投料试生产
- Connect to test rig and prepare for test run. 连接到测试装备和准备测试。
- The result of the test run satisfied us. 试车结果使我们很满意。
- You can also execute a test run of these objects. 您还可以对这些对象执行测试运行。
- Under Test Run, click one of the test run links. 在“测试运行”下,单击某个测试运行链接。
- The test or the test run timed out. 测试或测试运行超时。
- The test run might have a time-out value assigned. 测试运行可能会分配有一个超时值。
- The tester stopped the test run. 测试人员停止了测试运行。
- This stops the test run at its current location. 这将使测试运行在其当前位置停止。
- Shall we begin the test run at once? 我们立即开始试车好吗?
- ARPG typical game, yes, the test run very smoothly! 典型的ARPG游戏,不错,经测试运行非常流畅!
- Documentation (turnover packages, daily log entry, inspection reports, startup and commissioning test forms, etc) for all startup and commissioning activities. 所有启动和调试活动的文件(文件转交,每日日志,检测报告,启动和调试调试试验表等)
- Right-click the test run in the list and click View Results. 在列表中右击测试运行,然后单击“查看结果”。
- Commissioning tests shall be performed in the presence of the engineer or his representative. 测试生产检验必须在工程师或其代表在场的情况下进行。
- The default number of test runs to store is 25. 存储的测试运行的默认数量为25。