您要查找的是不是:
- The outer shell is an exposed brickwork within a concrete frame. 建筑的外壳是一个混凝土框架用清水砖墙填充。
- All concrete frame buildings in the region collapsed in the earthquake. 这个地区所有的混凝土结构建筑都在地震中倒塌了。
- Elsewhere throughout the central building the concrete frame was severely strained and cracked. 整个中间大楼的所有地方,混凝土构架严重变形和开裂。
- The hidden corbel is the vital supporting member in the dry beam-column connections in full precast concrete frame. 摘要在全预钢筋制混凝土框架梁柱干式暗牛腿节点中,钢筋混凝土暗牛腿是重要的竖向传力构件。
- The secondary moment of prestressed concrete frame is different from that of continuous beam. 预应力框架次弯矩与连续梁相比有着自己的特点。
- The flexure second-order effect of column in reinforced concrete frame is analysed. 对钢筋混凝土框架柱的纵向挠曲二阶效应做了分析。
- There were many multistory, reinforced concrete frame buildings of several types in Hiroshima and a smaller number in Nagasaki. 广岛有许多类型不同的多层钢筋混凝土构架建筑物,而长崎则较少。
- Duties: Responsible for architecture and finishing on concrete frame administration and workshop buildings, for work carried out by contractors. 工作职责:负责承包商的水泥结构办公楼及厂房建筑的装饰工作。
- This paper introduces the actual operating course of the truss hoisting with herringbone rotating longeron supported by concrete frame. 介绍了利用砼框架支撑人字转动桅杆吊装桁架的实际操作过程。
- In this paper,the controlled blasting technique is adopted to demolish reinforced concrete frame structure in complicated surroundings. 作者采用控制爆破技术拆除复杂环境下钢筋混凝土框架结构物。
- The purpose of the research would be used in test, design and construction of the exterior reinforced concrete frame joint. 为以后现浇钢筋混凝土框架外节点抗剪承载力的试验、设计和施工提供基本依据。
- The dapped-end beams are the vital supporting members in the dry rigid dapped-end connections in full precast concrete frame. 摘要在全预制钢筋混凝土框架梁柱干式企口连接中,钢筋混凝土缺口梁是重要的传力构件。
- This paper briefly introduces the design and applying situation of large-span belt passageway with continuous reinforced concrete frame. 简述了大跨度连续钢筋混凝土框架皮带走廊的设计与应用情况。
- Four: This building of top structure is all adopted the structure system underpart of the cast-in-place reinforced concrete frame adopt the board foundation of the raft. 本建筑上部结构采用全现浇钢筋混凝土框架结构体系下部采用筏板基础。
- The eventual structural design and implementary scheme is that, the first two bottom floors adopted concrete frame construction, the seven other floors adopted frame ... 最后采用的结构设计和实施方案是:底部两层为混凝土框架结构,上部七层为钢管混凝土柱加钢管支撑的框架结构,并对这一结构设计方案进行了重点介绍。
- Through the analysis and comparison with domestic and international experience,a concrete frame and long-term development of professional educational mode is put fo... 通过对国内外艺术设计教学模式的分析比较,提出了该专业教育模式的具体框架以及长期发展规划,建立一套系统而又富有弹性的教育体系。
- ZHANG Guojun,LU Xilin,LIU Boquan.Research on seismic behavior of reinforced concrete frame columns with transfinite axial compression ratios[J].Civ Eng J,2006,39(3):48. [2]张国军;吕西林;刘伯权.;轴压比超限时矩形钢筋混凝土框架柱的抗震性能试验研究[J]
- A, B, C district buildings: armoured concrete frame structure. Filling material is clay multi-aperture brick. Indoor and outdoor fitment materials are most water-proofing dopes. They are all non-burning substance. 区建筑:为钢筋混凝土框架结构,填充材料为粘土多孔砖,室内外装修材料为防水涂料等,均为非燃烧体。
- Therefore, it is necessary to intensify the research for the damage detection of reinforced concrete framed structure. 因此,加强钢筋混凝土框架结构损伤检测的研究是十分必要的。
- It is calculated that the tensibility valve of tensioning prestresed reinforcement and the prestressing loss value of the bondless prestressed concrete frame beams with large-scale space in a constructing engineering. 计算了某工程大跨度无粘结预应力混凝土框架梁施工时的预应力筋张拉伸长值和预应力施工损失值。