您要查找的是不是:
- direct labor hours basis [经] (计算制造费用率)以直接工时为基础
- The productive capacity is usually expressed in terms of an activity base, such as machine hours, direct labor cost, or direct labor hours. 标准生产能力通常表达为机器工时、直接人工成本、直接人工工时等指标。
- The cost driver used to assign process-engineering costs is the numbers of direct labor hours consumed by products 用于分配生产过程控制成本的成本动因是产品消耗的直接人工工时
- direct labor hours method [经] 直接人工小时法
- Support the training of direct labor. 协助对一线员工的培训。
- direct labor hour 直接工时
- direct labor hour method 按直接工时分摊间接费用法
- direct labor hour rate [经] 直接人工小时率
- Estimated labor hours of effort needed to implement the change. 估计实现变更所需的工作时间。
- Actual labor hours of effort needed to implement the change. 实际实现变更所花的工作时间。
- Analyze the direct labor cost, including measure the work hours, stipulate the standard work hours, maintain and readjust the standard work hours. 生产人力成本分析,包括测量作业工时,制定标准作业工时,并定期维护变更标准工时.
- Analyze the direct labor cost, including measure the work hours, stipulate the standard work hours, maintain and readjust the standard work hours. 生产人力成本分析,包括测量作业工时,制定标准作业工时,并定期维护变更标准工时。
- Direct labor costs are subdivided by job and then posted to job cost sheets. 直接人工由具体批别负担,并记录到批次成本计算表中。
- Prime costs represent the costs of direct material and of direct labor. 主要成本中包含了直接材料和直接人工费用。
- The direct labor costs are derived by multiplying the cost of labor per hour by the number, of man-hours needed to complete the job . 直接人工成本是用每小时的工人成本乘以完成一项任务所需人工小时数得来的。
- Works comprises of fault clearance, conduct neccssary repairs, and replace any damaged parts that are not duc to man handling. These services are on a 24 hours basis. 及时排除故障,进行必要的修理,质保期内无偿更换非人为损坏的机件,这类服务每天24小时提供。
- Supplied with local soil and crop parameters and climate data, the model could simulate soil loss on hour basis to evaluate different conservation tillage system. 该模型以小时为步长,根据气象数据、地表土壤水分、秸秆残茬覆盖率及地表粗糙度,模拟不同耕作体系下农田土壤风蚀流失量情况;
- The labor consumed in the processing is often divided into two types, direct labor and indirect labor. 分步法中,人工成本仍然分为直接人工和间接人工。
- Financial database containing information such as labor hours,incurred costs,budgets,and any project cost overruns. 财务数据库,包括如工时、发生的费用、预算以及任何项目费用超支等信息。
- The costs for a tea garden in slope-loand is NT$ 85,100-261,000 /ha/yr and the labor hours, 610-3200 h/ha/yr. 坡地(最高部份用手采)每年每公顷需投入之机械成本在85,100到261,000元间,人工小时介于610至3,200小时之间。