您要查找的是不是:
- Familiar with Engineering Change Control process. 熟练掌握工程更改控制流程。
- Track quality for the engineering change parts. 对工程变更件产品的质量追踪。
- Take the lead of engineering change about product. 负责领导产品方面的工程变更。
- Control of product engineering change. 产品工程变更之管制。
- Coordinate Engineering change timing with related parties. 与相关部门就工艺变更日程进行协调。
- Coordination and implementation of Engineering changes. 工程改变的协调及补充.
- Maintenance of the Shop Order, achieve Customer Spec changes and Product engineering changes. 产品定单的维护,完成客户规格更改和产品工程更改;
- Process Engineering Change Notices in a timely manner and communicate those changes to the appropriate shop personnel. 及时与相应的工作人员沟通相关的生产流程变化。
- Job PurposeTo manage control and administer all Engineering Change activities within the Engineering dept. 负责工程部门所有工程变更活动的控制和管理。
- ECMA Electronic Component Manufacturer Association ECN Engineering Change Notice. 工程更改通知工程需要更改或发表说明时使用的文件。
- Update manufacturing orders as necessary by monitoring system inquiries and new engineering change orders. 通过监视系统需求和新的工程变化订单来更新生产订单。
- Is a formal engineering change procedure implemented? Briefly describe the process. 是否实施工程更改操作?简要描述该过程。
- PLM vendors with a PDM background have long had interfaces to ERP systems to handle engineering change notices. PDM背景的PLM软件商早就设计了ERP系统交互界面来处理工程变更通知。
- Are engineering changes reiewed and approed by authorized personnel prior to implementation? 是否工程变更在执行前被授权人员审查和批准?
- Responsible for evaluation, analysis, trouble-shooting, engineering changes of all existing and new ITE products of sales in domestic market. 负责执行所有为有利于制造生产而制定新的生产过程,包括经故障分析而实施的纠正预防措施。
- Must evaluate, validate, initiate, facilitate, and verify all engineering changes and manufacturing deviations during the prototype phase to maturity. 必须能够从样机原型阶段到成熟投入生产阶段有效评估、带动、推动并且确保所有的工程更改和生产问题。
- Process and line set all engineering change notices for timely, accurate, cost effective implementation into production. 及时处理工程变更通知,将精确的、有效的成本执行到生产工作中。
- Traditional repair and preventive maintenance services including replacement parts and engineering changes necessary to preserve technology. 提供传统维修和预防性维护服务,包括为保护技术而进行的必要零件更换和工程变动。
- Supplier must maintain a process that ensures purchased parts are approved and available to support agreed upon timelines for engineering changes. 试译:供应商须维护一套机制,确保采购部件得以批准,可以用来支持已同意的工程变更。
- General data includes engineering change level, phase covered (prototype, pre-launch, production), key contact, part/process step number, process name/operation description. 基本数据包括工程更改等级、所处阶段样件试生产生产、主要联系人、零件/过程步骤编号、过程名称/作业描述。