您要查找的是不是:
- After comparing the highest water level series with the dam height, we estimated the possible flood control risk rate and analyzed the calculating result. 把所求的最高水位系列与坝高进行比较,判断柘林水库可能存在的防洪风险率,并对计算结果进行分析。
- Influence of time-varying effect on flood control risk rate for dams 时变效应对大坝防洪风险率的影响研究
- flood control risk rate 防洪风险
- Estimating Flood Hazard Risk Rate of Flood Control Region Under Flood Encountering Combination 洪水遭遇组合下防洪区的洪灾风险率估算
- Application Studies of Flood Control Risk Decision Model 防洪风险决策模型的应用研究
- Flood control risk analysis on rising limited water level in flood season 提高水库汛限水位的防洪风险研究
- Parliament appropriated two million pounds for flood control. 国会拨款两百万英镑作为防治水灾之用。
- flood control risk analysis 防洪风险分析
- The risk factors of operation during the intercepting and storing the flood tail is analyzed and identified,a calculating method of the risk rate from hydrological fre... 通过对石泉水库不同超蓄水位的风险率进行计算,结合可接受风险率值,得出了该水库拦蓄洪尾超蓄运用的期望水位。
- The historical development of flood control policy in U.S.A. 美国防洪政策演变。
- It can be classified into inherent risk, control risk and detection risk. 影响计算机审计的风险因素有固有风险、控制风险、检查风险三类。
- flood control risks 防洪风险
- A flood control protected area means an area protected by flood control works according to flood control standards. 防洪保护区是指在防洪标准内受防洪工程设施保护的地区。
- Flood control planning constitutes the bas is for the control of rivers and lakes and the construction of flood control works. 防洪规划是江河、湖泊治理和防洪工程设施建设的基本依据。
- SARA immediately assigns a real time, on-line risk rating. SARA立即给予实时、在线的风险等级评定。
- In New Orleans, when flood controls failed, so did law and order. 在新奥尔良,当洪水失去控制的时候,法律和命令也失去了约束。
- What can only cause Icelandic Koruna to be strong raises its risk rate of return, but this at present not in the least sign. 惟一能够使冰岛克朗坚挺的是提高其风险回报率,而这目前毫无迹象。”
- Regional flood control planning should be subject to the flood control planning for a certain river basin. 区域防洪规划应当服从所在流域的流域防洪规划。
- Lifestyle modifications to control risk factors, including regular exercise, proper nutrition, and smoking cessation. 生活方式的改进以控制危险因素,包括有规律的锻炼,适当的营养,和终止吸烟。
- Finally, it identifies certain pres-sing issues awaiting to be studied and coped with in future flood control works. 最后,提出了面向未来防洪事务的亟待研究与解决的若干问题。