您要查找的是不是:
- After comparing the highest water level series with the dam height, we estimated the possible flood control risk rate and analyzed the calculating result. 把所求的最高水位系列与坝高进行比较,判断柘林水库可能存在的防洪风险率,并对计算结果进行分析。
- Application Studies of Flood Control Risk Decision Model 防洪风险决策模型的应用研究
- Influence of time-varying effect on flood control risk rate for dams 时变效应对大坝防洪风险率的影响研究
- Flood control risk analysis on rising limited water level in flood season 提高水库汛限水位的防洪风险研究
- Parliament appropriated two million pounds for flood control. 国会拨款两百万英镑作为防治水灾之用。
- flood control risks 防洪风险
- flood control risk analysis 防洪风险分析
- flood control risk rate 防洪风险
- The historical development of flood control policy in U.S.A. 美国防洪政策演变。
- How to control risks from product designing to sales to operation and so on? 如何控制从产品设计到销售到运营过程中的风险?
- Audit risks consist of intrinsic risk, control risk and examination risk. 审计风险由固有风险、控制风险和检查风险构成。
- A flood control protected area means an area protected by flood control works according to flood control standards. 防洪保护区是指在防洪标准内受防洪工程设施保护的地区。
- Flood control planning constitutes the bas is for the control of rivers and lakes and the construction of flood control works. 防洪规划是江河、湖泊治理和防洪工程设施建设的基本依据。
- It can be classified into inherent risk, control risk and detection risk. 影响计算机审计的风险因素有固有风险、控制风险、检查风险三类。
- In New Orleans, when flood controls failed, so did law and order. 在新奥尔良,当洪水失去控制的时候,法律和命令也失去了约束。
- Regional flood control planning should be subject to the flood control planning for a certain river basin. 区域防洪规划应当服从所在流域的流域防洪规划。
- Finally, it identifies certain pres-sing issues awaiting to be studied and coped with in future flood control works. 最后,提出了面向未来防洪事务的亟待研究与解决的若干问题。
- We are marketing the second key is how to control risks, different enterprise risk is not the same. 我们讲营销的第二个重点就是怎么控制风险,不同的企业风险是不一样的。
- But with more rains on their way and with difficulties in flood control, the ordeal is far from over. :主播:自从五月以来,洪水与暴雨已经夺走了超过500条人命,最后在一些地区总算降到警戒线以下。
- In order to better understand the meaning of the survey finding, the ICAC had subsequently contacted the Control Risks based in London for more detailed information. 为进一步了解有关调查结果的具体内容,廉政公署随后联络总部设于英国伦敦的Control Risks公司,以取得更详细资料。