您要查找的是不是:
- furnace control test 炼炉控制试验
- Chemical control test of Cryptorrhynchus lapathi L. 杨干象的药剂防治试验。
- All control equipment should be located in the furnace control room. 所有的控制设备都应当装在窑炉控制室里。
- Remote control test for fire pump and emergency fire pump. 消防泵、应急消防泵遥控操作试验。
- You can test the control in the ActiveX Control Test Container. 可以在ActiveX控件测试容器中测试控件。
- Start two instances of the ActiveX Control Test Container. 启动ActiveX控件测试容器的两个实例。
- Per AMM,control test OK,leakage within limits,released. 按航线维护手册,操纵测试正常,渗油量符合放行标准,同意放行。
- Use the furnace control is the key, overheated is too thin easy to deform, cold shaping would not be too hard. 使用时火候的控制是关键,过热则太稀易变形,冷了又会太硬无法塑形。
- Automatic controller test for auxiliary boiler. 废气锅炉效用试验。
- Pan Honghua, Su Hongye, Chu Jian et al.Application of predictive functional control in electric heating furnace control[J].MEEM,1999, (5): 130-132. [3]潘红华;苏宏业;褚健;等.;预测函数控制在工业电加热炉中的应用[J]
- Main problems of previous HTM furnace control system in polyester plant are simply analysed.It is given that hardware configuration and software design of modification plan. 简要分析了聚酯装置热媒炉原控制系统存在的问题,给出了改造方案的硬件配置和软件设计内容。
- Insert the control into a control container like ActiveX Control Test Container and test its properties and events. 将控件插入到控件容器(如ActiveX控件测试容器)中,并测试其属性和事件。
- You can test out the control in the ActiveX Control Test Container by opening the ATLEdit Class. 通过打开ATLEdit类可在ActiveX控件测试容器中测试该控件。
- You can test the control in the ActiveX Control Test Container by opening the ATLEdit Class. 可以通过打开ATLEdit类在ActiveX控件测试容器中测试该控件。
- Raytheon Company launched its first GBU-53/B Small Diameter Bomb II as a control test vehicle (CTV) flight. 日前雷神公司完成GBU-53/B II型小直径炸弹的首次控制测试载具(CTV)飞行。
- Two controllers were designed,one was coking furnace controller,the other was main fracionation system controller. 设计两个先进控制器,分别是焦化加热炉控制器和主分馏系统控制器。
- Two controllers were designed, one was coking furnace controller, the other was main fracionation system controller. 设计两个先进控制器,分别是焦化加热炉控制器和主分馏系统控制器。
- Objective To investigate the feasibility of asthma control test meter in pediatric clinical work. 目的:探讨哮喘控制测试量表在儿童临床工作中应用的可行性。
- To evaluating the reliability of ECU, actual control test was carried out on the oil pump test bed. 为了验证电控单元实际工作的正确性,对电控单元在油泵试验台上进行了实际控制过程的试验。
- Orderly growth of mesophase was studied using FCC slurry as raw materials, in a multi-tube well-crucible furnace controlled by programmed heating. 试验以预处理的FCC油浆为原料,采用程序升温、多管井式坩埚炉进行热转化形成有序生长中间相反应研究。