您要查找的是不是:
- geological model building 地质建模
- Build 3D geological model according to the layer-structured stratum and the particularity of the bore data. 根据地质体的层状特征和钻孔数据的特殊性,采用似三棱柱体作为基本体元构建三维实体模型。
- Visual model building and "mind mapping" with the Network Editor tool. 视觉模型的建设和"心智地图"的网络编辑工具.
- First develop the software for dynamic geological model, which can simulate the varied absolute permeability. 首次开发出了动态地质模型的油藏数值模拟软件,它可模拟绝对渗透率随时间变化的情形。
- The substratum correlation is one of the fundamental techniques in the reservoir geological model. 小层对比是储层地质模型研究的基本问题之一,由于对比技术难度较大,目前仍由专家进行人工对比。
- Building coal bed geological model by SURFER 应用surfer软件建立煤矿床地质模型
- According to the stratigraphic petrophysical parameters and the result of oil reservoir description, the three-dimensional geological model is built. 利用地质资料及其研究成果所得到的地层物性参数,并且通过油藏精细描述提供的物性数据,建立了相应的三维地质模型;
- It proves that using the gradual layer analytical method to set up the geological model and evaluate trapping quantitatively is effective. 实例证实利用层次分析法建立地质模型对圈闭成藏进行定量评价是切实可行的。
- Velocity model building for prestack depth migration is a model based iteration process. 摘要叠前深度偏移速度建模是一种基于模型的迭代修正过程。
- Like mahogany, because of it's coarse grain stucture is it not really all that suitable for model building. 像桃花心木,因为它粗纹理结构是不那么适合制作舰船模型。
- Balsa wood has it's place in model building but it is not all that useful in period model ships. 巴尔沙木,在制作舰船模型的木材中占有一定的位置,但它并不适合舰船模型的全部。
- The minimum travel-time tree algorithm is one of the main methods to trace rays, which is based on Huygens' and Fermat's principles and can be applied to complex geological model. 摘要最小旅行时树法是目前主要射线追踪方法之一,该方法以惠更斯原理和费马原理为基础,具有适应复杂地质模型的优点,缺点是速度较慢。
- Whereas if UGM model is used for model building,it is easier to solve the problem of prediction if ot... 因而其方法与结果对于预防煤矿安全事故的发生,保证煤矿的安全生产具有重要意义。
- A training image is the numerical representation of a prior geological model that contains the patterns believed to exist in realistic reservoirs under study. 先验地质模型包含了被研究的真实储层中确信存在的样式,而训练图像则是该模型的定量化表达。
- The practice indicates that using geological multiple bundaries and geological paired method to limit Kriging estimator can efficiently improve accuracy of geological model. 实践表明,用地质复合边界及地质配对法限制克里格法估值能有效提高地质模型精度。
- The solution of hydrogeologic parameters based on genetic algorithm is adopted in this article ,at the same time,the method is applied to a geological model. 提出了求解水文地质参数的遗传算法,并将该方法应用于一地质模型中。
- A 3D model building system of compressive comminution of particle beds by adopting of VB language, Solidworks 2001 plus and SQL server data base. 系统采用vb语言,连接Solidworks2001plus二次开发,结合SQLserver数据库,开发了一套层压破碎三维建模系统。
- The geological model of the reservoirs could be described as a combination of tubular caves system of Dongwu stage and Himalaya tectonic fracture network. 缝洞系统是在东吴期古溶洞系统基础上,经埋藏后充填和溶解,最后由喜山期构造裂缝改造而成。
- Using optimal control method, inversion of solid density and fluid density about the geological model of layer in Bi-phase media is studied in this paper. 利用最优控制法,对层状地质结构模型的双相介质中的固体密度和流体密度进行反演,给出了计算机模拟结果。