- The wetting deformation of coarse-grained material is a key problem in design of high earth rockfill dam, but it is not solved well so far. 土石坝粗粒料浸水湿化变形,是目前高土石坝设计理论中的关键问题之一,但没有很好解决。
- high earth rockfill dam 高土石坝
- Approach To Random Simulation Methed about Construction Process of High Earth Rockfill Dams 高土石坝施工过程随机模拟方法探讨
- The development trend of the earth rockfill dam security monitoring system is investigated and the development principia of the earth rockfill dam security monitoring software system are given. 论述了在当前科学技术条件下;土石坝安全监测系统的发展趋势;确定了土石坝安全监测软件系统开发的基本原则;并对其进行了阐述和论证.
- A conclusion was made that dispersive clay as materials of dam or antiseepage material was feasible.2.The main theories and methods of earth rockfill dam were summarized in this paper. 简要介绍了土工合成材料的功能,并较详细地介绍土工膜和土工布在土石坝防渗和反滤中的应用,并对土工合成材料的耐久性等问题进行分析;
- Fill Material Test Technique and Prototype Observation for High Earth and Rockfill Dam in Mexico 墨西哥高土石坝坝料试验技术和原型观测
- high earth and rockfill dam 高土石坝
- Some issues to be studied in the construction of high earth and rockfill dams 高土石坝建设的若干应用基础研究问题
- High Earth and Rockfill Dams in Japan and Their Prototype Observation 日本高土石坝现况与原型观测
- Cellular Automation-Based Fuzzy Simulation Model of Transportation System for Earth Rockfill Dam Construction 土石坝施工运输系统元胞自动机模糊仿真模型研究
- Keywords earth rockfill dam (ERD);safety monitoring;inverse plumb group;gray model;reliability;unascertained filtering (UF);blind information; 关键词土石坝;安全测控;倒垂组;灰关联模型;可信度;未确知滤波;盲信息;
- Theory and Practice of Construction Simulation for High Rockfill Dam. 高土石坝施工仿真理论与实践。
- earth rockfill dam 土石坝
- Keywords coarse-grained material;wetting deformation;pause-shear deformation;maximum wetting stress level;grain breakage;wetting deformation plastic model;earth rockfill dam;finite element method; 粗粒料;湿化变形;停机变形;最大湿化应力水平;颗粒破碎;湿化塑性模型;土石坝;有限元法;
- high earth and rockfill dams 高土石坝
- The problems such as design of rockfill dam with high core wall, the stability of surrounding rocks and the design of spillway are the key to the project construction. 该工程高心墙堆石坝设计、地下厂房围岩稳定、溢洪道设计等问题是工程建设的关键问题。
- These results can be referenced to the plan of water level procedures on the dam;and the behaviors of high rockfill dam with asphalt concrete core under high water head are studied. 研究结果可供大坝蓄水计划参考,并为高水头下高沥青混凝土心墙坝的运行提供一定的参考。
- In combination with the Yemen's actual conditions, it is reasonable to adopt overflow concrete face rockfill dam. 结合也门国的实际情况,采用溢流混凝土面板堆石坝比较适用。
- Transient seepage analyses for Gouhou concrete faced rockfill dam were conducted using the unsaturated soil seepage theory. 摘要利用非饱和土渗流理论,对沟后混凝土面板砂砾石坝进行瞬态渗流数值模拟。
- The maximum dam height of the rockfill dam with core wall for the Nuozhadu Hydropower Station is 261.5 m. 糯扎渡工程心墙堆石坝最大坝高261.;5m。