您要查找的是不是:
- high dam technology 高坝技术
- An ancient city on the Nile in Egypt,site of the Aswan High Dam. 埃及的尼罗河畔的一座古城,阿斯旺水坝所在地。
- Egypt's leadership in the Arab was cemented by the Aswan High Dam. 阿斯旺大坝巩固了埃及在阿拉伯世界的领袖地位。
- After 11 years of construction, the Aswan High Dam in Egypt is completed. 1970年的今天,历经11年的修建后,埃及的阿斯旺水坝竣工完成。
- The adoption of ship lift is also a very effective mean for high dam. 升船机也是解决高坝通航一种非常有效的手段。
- Egypt's leadership in the Arab world was cement ed by the Aswan High Dam. 埃及由于建造了阿斯旺大坝而巩固了在阿拉伯世界的领导地位。
- Egypt's leadership in the Arab world was cemented by the Aswan High Dam. 埃及由于建造了阿斯旺大坝而巩固了其在阿拉伯世界的领导地位。
- Before the high dam was built, the nile flooded every year and destroyed the fields nearly. 在大坝建成之前,尼罗河每年都泛滥,淹没两岸大片土地。
- A city of southern Egypt at the First Cataract of the Nile River near the Aswan High Dam. 阿斯旺:埃及南部一城市,位于尼罗河第一瀑布,阿斯旺水坝附近。
- And because there was a need, before the High dam tamed the Nile, to live beyond the reach of the annual floods. 同时这也是因为在大坝控制住尼罗河之前,有必要住得远一点,以躲避每年发生的洪水。
- The first new design was by Alexander Gorlov, a Russian civil engineer who worked on the Aswan High Dam in Egypt. 第一个新设计是俄罗斯的土木工程师亚历山大.;佐罗夫完成的,他先在埃及的阿斯旺大坝工作,后来移居到美国。
- Dongqing Hydropower Station dam was filled with the sand shale material excavated from spillway, which is a highly demanding technology in the high dam filling with lots of filling zones. 摘要董箐水电站大坝首次在高坝填筑中利用溢洪道开挖砂泥岩料填筑,且填筑分区较多,技术要求高。
- A village elder, Amin Ibrahim, invited me into his house and gave me a cheerier view of the effects of the Aswan High Dam than I had heard before. 村里一位长者,名叫阿明·易卜拉欣,请我到他家去做客,向我介绍了阿斯旺高坝的影响。他的话比我以前听到的更为乐观一些。
- The Great Wall of China, the Pyramids of Egypt and the Aswan High Dam are usually considered the biggest man-made projects in the world. 中国的长城,埃及的金字塔和阿斯旺高坝通常被认为是世界上最大的人造工程。
- Experimental study on hydraulic fill dam technology 水力冲填筑坝技术试验研究
- The damming technology of concrete face rockfill dams is a significant technologyachievement in the field of modern damengineering construction. 混凝土面板堆石坝筑坝技术是现代坝工建设领域取得的一项具有重大意义的技术成就。
- In 1971 engineers and workers completed the Aswan High Dam, nearly 600 miles upriver from Cairo toward the Sudanese frontier. 1971年,技术人员和工人在从开罗向苏丹边境方向600英里处建造了阿斯旺高坝。
- It shows that the depth and sand concentration of the river is an important factor affecting the desorption of TDG downstream of high dam. 在同样单宽流量下,含沙水体比清水有更高的TDG饱和度。
- There has made a huge advance in roller compacted concrete damming technology of our country after about 20 years of further research and practical application. 经过近20年的深入研究和工程实践,我国碾压混凝土筑坝技术已有了很大的进步,其坝型、坝高、坝体体积和工程数量都已达到或超过目前世界先进水平。
- Along with the constant advance of RCC damming technology in domestic, the applying scale expands incessantly, the technology of material achieves great progress too. 摘要随着我国碾压混凝土筑坝技术的不断进步,应用规模的不断扩大,筑坝材料技术也有了很大的进步。