您要查找的是不是:
- Theory and Practice of Construction Simulation for High Rockfill Dam. 高土石坝施工仿真理论与实践。
- These results can be referenced to the plan of water level procedures on the dam;and the behaviors of high rockfill dam with asphalt concrete core under high water head are studied. 研究结果可供大坝蓄水计划参考,并为高水头下高沥青混凝土心墙坝的运行提供一定的参考。
- Maopingxi high rockfill dam is the accessorial dam of Three Gorges Project (TGP), which is also the highest rockfill dam with asphalt concrete core in China. 摘要茅坪溪防护坝是三峡工程的副坝,也是目前中国最高的沥青混凝土心墙坝。
- high rockfill dam with core wall 高心墙土石坝
- The present method is verified as feasible through the application of an earthwork allocation and transportation problem of a high rockfill dams. 在某大型堆石坝土石方调运中的应用及其与线性规划方法结果比较表明,本文提出的方法是可行的。
- high rockfill dam 高土石坝
- The wetting deformation of coarse-grained material is a key problem in design of high earth rockfill dam, but it is not solved well so far. 土石坝粗粒料浸水湿化变形,是目前高土石坝设计理论中的关键问题之一,但没有很好解决。
- By means of shaking-table test, the static and dynamic properties of high rockfill dams constructed on deep overburdens are researched; 通过振动台试验研究,探讨了修建在深覆盖层上的高堆石坝动力工作性态;
- Abstract: By means of shakingtable test , the static and dynamic properties of high rockfill dams constructed on deep overburdens are researched; 文摘:通过振动台试验研究,探讨了修建在深覆盖层上的高堆石坝动力工作性态;
- The problems such as design of rockfill dam with high core wall, the stability of surrounding rocks and the design of spillway are the key to the project construction. 该工程高心墙堆石坝设计、地下厂房围岩稳定、溢洪道设计等问题是工程建设的关键问题。
- In combination with the Yemen's actual conditions, it is reasonable to adopt overflow concrete face rockfill dam. 结合也门国的实际情况,采用溢流混凝土面板堆石坝比较适用。
- Transient seepage analyses for Gouhou concrete faced rockfill dam were conducted using the unsaturated soil seepage theory. 摘要利用非饱和土渗流理论,对沟后混凝土面板砂砾石坝进行瞬态渗流数值模拟。
- Rockfill stuff and subgrade soil should be studied on settlement rule for high rockfill embankment respectively,for the differences of the pressurized state and settlement rule. 由于填石料与地基土的受力性能不同,沉降规律也大不相同,因此提出先分别考虑路基和填石料的变形,然后再叠加的方法来研究高填石路堤沉降规律。
- The maximum dam height of the rockfill dam with core wall for the Nuozhadu Hydropower Station is 261.5 m. 糯扎渡工程心墙堆石坝最大坝高261.;5m。
- The face slab rockfill dam of Shuibuya Hydropwer Station is the highest one being built in the world at present. 水布垭水电站混凝土面板堆石坝,属目前在建的世界第一高面板堆石坝。
- The crushing side wall is used the upstream consolidation slope measures of rockfill dam with concrete face slab. 混凝土面板堆石坝采用挤压边墙作为大坝上游固坡措施。
- The construction of upstream slope of cushion materials of faced rockfill dam is one of key construction items. 摘要面板堆石坝垫层料上游坡面施工是一项关键项目。
- The dam of Dongtang Reservoir is a rockfill dam with asphaltum concrete core, the hight of the dam is 46 m, and the width of the core is 0.5m. 洞塘水库枢纽工程设计坝高 46m;为沥青混凝土心墙石渣坝 ;心墙厚度为 0 .;5m。
- The concrete face rockfill dam of Lianhua Hydropower Station is the first large scale face rockfill dam in the cold region in China at present. 莲花水电站建设的混凝土面板堆石坝,是目前我国在寒冷地区修建的第一座大型面板堆石坝。
- Additionally, the stressand displacement of contact element are analysed, and the contact condition between"soft adapter" and rockfill dam are studied. 另外,还分析了接触单元的受力、变形情况,研究“软接头”与堆石坝之间的接触情况。