hole-drilling pouring stake
英
美
hole-drilling pouring stake的用法和样例:
例句
- The bored pile-group is used for the foundation of the main pylon piers and a drilling platform will be used as temporary facilities for construction of the pile foundation.
主塔墩基础采用钻孔灌注桩群桩基础,采用钻孔平台作为桩基施工临时设施。
hole-drilling pouring stake的相关资料:
临近单词