您要查找的是不是:
- load bearing cross wall 承载横墙
- Unique 3 point load bearing design for smooth operation. 独特的3点负载支撑结构,有利于平稳运行。
- Full is my tears, load bearing I is being brokenhearted. 满是我的泪水,承载着我心碎。
- The results indicate that though the strength of the AAC block islow, the AAC block wall can be used as load bearing wall of multistory buildingstructural system with better ductility. 分析结果表明,虽然蒸压加气混凝土砌块的强度比较低,抗剪强度略小,但该种墙体的延性较好,可以用于低层住宅结构体系的承重墙体。
- The paper analyzes the cross wall crackings caused by the failure of the roof insulating materials. 为此,就屋面保温材料失效造成横墙开裂进行了分析。
- It can be known that the cross wall can improve the total cooling performance of tower under low speed crosswind. 研究表明:低风速时,十字隔墙可增大冷却塔总体冷却性能;
- The load bearing part of a structure, in exhibition work usually a box-like timber frame. 结构的承重部分,在展览业务中通常指箱形的木头框架。
- IF BACKPACK/DUFFLE BAGS ETC., THE LOAD BEARING STRAPS MUST BE FLAG STITCHED IN PLACE TO ENSURE THAT THEY DO NOT BREAK UNDER STRAIN. 诸如背包,行李袋等,承重带必须加缝,以确保在受力情况下不会断裂!
- This achieves an effective load bearing of the full strain off the wooden structure, thus optimising safety. 这进一步强化了木质音箱结构的坚固度,更为安全可靠。
- The resulting benefits are high stiffness and load bearing at low weights and with low warpage. 最终带给产品的好处是在低重量和低翘曲情况下体现出的高刚性和承载能力。
- ConclusionSclera of high myopia is more flexibly and its load bearing capacity is lower than emmetropia . 结论高度近视眼与正常眼相比更容易发生变形,具有较低的承载能力。
- The existence of a relatively hard layer just below the raft can remarkably enhance the load bearing action of raft. 地表硬壳层的存在能够有效地提高筏板的分担作用。
- IF BACKPACK/ DUFFLE BAGS ETC., THE LOAD BEARING STRAPS MUST BE FLAG STITCHED IN PLACE TO ENSURE THAT THEY DO NOT BREAK UNDER STRAIN. 诸如背包,行李袋等,承重带必须加缝,以确保在受力情况下不会断裂!
- Zygomycota A phylum of fungi whose members have haploid, nonseptate hyphae (i.e. hyphae that lack cross walls). 接合菌纲:是真菌界的一个纲,所属成员都具有单倍体无横隔菌丝(即:菌丝体细胞没有细胞壁相隔)。
- Load bearing can happen only 24 hours after the foundation line laying is completed and, it is necessary to keep the indoor air circulating. 地脚线铺设完毕后,在24小时后方可承重并要经常保持室内空气的流通。
- Finally hyphae may or may not be septate-having cross walls that segregate independent cells each with at least one nucleus. 菌丝或有细胞隔膜或没有细胞隔膜,但至少有一个细胞核。
- Load bearing is allowed only 24 hours after the floor laying is completed, and, it is necessary to keep the indoor air circulating. 地板铺设完毕后,在24小时后方可承重并要经常保持室内空气的流通。
- After the length of the gap increasing to a certain value the load bearing ability and actual shear strength intends to decrease. 研究中还发现间隙所处的位置对接头的抗剪强度有较大的影响,胶层端部预留间隙使接头的承载能力和实际强度均显著下降。
- The effect of hole on the SCF and load bearing capacity of composite laminate became more evident with increasing anisotropic degree. 随著材料各向异性程度的提高,开孔损伤对板件的应力集中因数和承载能力的影响增大。这一结果在试验中得到证实。
- A new method is presented to analyze the vertical load bearing performances of prefab piles with optimization and back analysis techniques. 对预制桩的竖向承载性能进行计算研究,提出了一种分析预制桩竖向承载性能的新方法。