您要查找的是不是:
- mine field gap 雷区可通道
- I am dispatched to mine field by him to dig landmine. 句可以理解为“我被他派往雷区”+“我挖地雷”。对译的英文是:
- II am dispatched to mine field by him to dig landmine. 句可以理解为“我被他派往雷区”+“我挖地雷”。对译的英文是:
- Applying geodynamic zoning method, this article has studied the mine field. 因此,对该井田进行了地质动力区划的研究。
- Mine fields were not yet planted. 地雷尚未布置。
- Abstract: This paper introduces the category, hazard, and program of treatment of mine field bottler disputes. 文章摘要: 介绍了矿区边界纠纷的类别、危害,处理纠纷的程序。
- The high quality talc in Haicheng mine field can be used to many kinds of industry. 海城滑石矿矿石质量高,可满足各种工业用途的要求。
- The banded gneisses underlying the mine field are, as a rule, micaceous, the amount of biotite determining mainly the shades of the bands. 本矿区的带状片麻岩照例富含云母,黑云母的多少决定片麻岩条带的色调。
- This paper discusses the feasibility of the mine restore engineering from the aspects of mine field exploit, aeration, lift, ground production system. 从井田开拓、通风、提升、地面生产系统等方面探讨了矿井恢复工程的可行性
- Those shitty things happened one after another, it was like that I stepped into a fu*king mine field, it's just keep exploding. 一大堆一大堆的事情发生接二连三的发生在自己身上,既破财,心灵又受伤。
- A quarter of city is park, so it is called"the park city". Then leave for SUFEILI gold mine field, understand the hard history of the china labor fossick in those days. 国风味。市区的四分之一是公园,故有“公园都市“之称。然后前往苏菲力金矿场,了解中国劳工。
- On the basis of investigation for the accumulated water in goaf areas in the Tongxin mine field,occurrence of the accumulated water in goaf areas is examined in this paper. 本文依据井田范围内采空积水调查资料,探讨了采空积水的贮存分布规律,并采用冒落带及导水裂隙带最大高度的计算方法,预测了未来开采下伏可采煤层造成的漏水灾害区。
- I think your plans will chime in with mine. 我想你的计划会同我的相吻合。
- This is to cover a mine field. 这个就是埋地雷。
- MGIS is an application system of geographic information system (GIS) in the mining field. 矿业地理信息系统(MGIS)是地理信息系统(GIS)在矿业领域的应用系统。
- The field artillery pounded away at the for tress. 野战炮兵连续炮击那座要塞。
- It was a freak of mine to wear pink pajamas. 穿上粉红色睡衣是我一时的奇想。
- The paper analyzes the occurrence regularity of rock burst of about 263 times in Laohutai mine field by database, the osculating relations of rock burst and active faults were summarized. 摘要应用数据库对老虎台井田其发生的263次冲击地压之统计分析表明,岩体动力现象与活动断裂有密切关系。
- The first company commander you wrote about as running away with shell shock [see p. 46] I went and got him, carried him out of a mine field, and took him to Doc McConahey in the aid station. 阁下描写之首名连长,即那位因弹震而逃跑者[见46页],当时我去劝他,并带他离开雷区,在救护站送他去看麦克科纳赫医生。
- The roof control design in mined field is the key to roof control and the movement rule of roof terrane is the basis of the roof control design. 采场控顶设计是顶板管理的关键因素,而顶板岩层的运动规律是采场控顶设计的依据。