- By superposition principle, the theoretical deduction to modified isochronal testing data drives a linear relationship equation. 采用叠加原理,对修正等时试井数据进行理论推导,得出直线关系式;
- Conventional application of modified isochronal testing is mainly to determine the current open flow capacity of the gas well,and thus making a reasonable working system. 修正等时试井的传统应用,主要确定气井当前无阻流量,进而制定合理工作制度。实际上,还可以根据延续生产动态资料,分析气井生产动态特征,评价稳产水平和能力;
- There are two defects in the analysis method of the conventional modified isochronal test data, especially in the low permeability gas well with small control reserve of a single well. 对于单井控制储量比较低的低渗透致密储集层气井,传统修正等时试井分析方法的不足是:二项式系数偏小甚至为负,稳定点的确定没有完全按定义进行。
- A new analysis method of modified isochronal test data 修正等时试井资料分析新方法
- Keywords Da Niudi gas field;modified isochronal test;productivity equation; 大牛地气田;修正等时试井;产能方程;
- Keywords single-point test;modified isochronal test;open flow potential;method; 一点法试井;修正等时试井;无阻流量;方法;
- Application of Modified Isochronal Testing to Performance Analysis of Gas Reservoirs 修正等时试井在气藏动态分析中的应用
- Keywords Gas reservoir;Modified isochronal testing;Performance analysis;Open flow capacity;Pressure;Curve.; 气藏(井);修正等时试井;动态分析;无阻流量;压力;曲线;
- The Theory Analysis of Abnormal Producibility Phenomenon of Modified Isochronal Test in Low Permeability Gas Reservoir 低渗透气藏修正等时试井产能异常现象的理论分析
- Keywords Gas well productivity;Correction;Modified isochronal test;Changing skin factor; 气井产能;校正;修正等时试井;变表皮;系数;
- Keywords deliverability potential evaluation;modified isochronal test;single-point potential test;new thought; 产能评价;修正等时试井;单点法产能测试;新思路;
- Keywords low permeability pools;modified isochronal test;productivity;anomaly;analysis; 低渗透气藏;修正等时试井;产能;异常;分析;
- modified isochronal testing 改进等时试井
- modified isochronal test 修正等时试井
- According to this problem,this paper proposes a modified isochronal well test with bottom hole liquid loading. 针对这个问题,提出了一种存在井底积液时的修正等时试井资料解释方法。
- Modified isochronal well test plays an important role in productivity evaluation of gas field. 修正等时试井在气田产能评价中发挥了相当重要的作用。
- The modified isochronal well test data with bottom hole liquid loading will have abnormity, causing a fail of processing with the original theory or much error. 摘要存在井底积液的修正等时试井资料会出现异常,使原有理论无法处理相应的测试资料或处理的结果误差较大。
- The modified isochronal well test data with bottom hole liquid loading will have abnormity,causing a fail of processing with the original theory or much error. 存在井底积液的修正等时试井资料会出现异常,使原有理论无法处理相应的测试资料或处理的结果误差较大。
- To resolve the problem, based on backpressure test theory and superposition principle, this paper designed a new test method, named Backpressure Isochronal Test. 以回压试井理论和渗流叠加原理为基础,提出了"回压等时试井"产能评价方法,该法所需测试时间与"单点法"大致相同,但能较准确地评价低渗气井产能。
- Nowadays, the main method of determining oil and gas well deliverability is steady well test, that is back-pressure testing, isochronal testing, revisionary isochron test and single-point test. 目前确定油、气井产能的主要方法是稳定试井方法,即回压试井、等时试井、修正的等时试井和一点法试井。