您要查找的是不是:
- YAN Xiang-lian.Monitoring and diagnosis of MOV surge arrester in power networks[J].Electric Power Automation Equipment,2003,23 (2):79-82. [2]颜湘莲.;电力系统中金属氧化物避雷器的监测与诊断[J]
- Application of Prony method to parameter identification of synchronous generators[J].Electric Power Automation Equipment,2006,26(9):1-4. Prony法在同步发电机参数辨识中应用[J].;电力自动化设备;2006;26(9):1-4
- The Design and the Implement About the Real Time and Communicate Meet in DTS-SOTS[J].Electric Power Automation Equipment,2002,22(6):33-35. DTS-SOTS实时通信接口的设计与实现[J].;电力自动化设备;2002;22(6):33-35
- Design and implementation of real time communication interface between DTS and SOTS[J].Electric Power Automation Equipment,2002,22 (6):33-35. DTS-SOTS实时通信接口的设计与实现[J].;电力自动化设备;2002;22(6):33-35
- Starting Date:2007.12.01Company DescriptionSiemens Power Automation Ltd.(SPA) is active in field of energy autom...... ... 公司名称:西门子电力自动化有限公司工作地点:江苏省南京市发布时间:2009-3-29
- SU Jing-de.Lightning protection and anti-interference of telecontrol equipment[J].Electric Power Automation Equipment, 2001,21 (10): 54 - 55. [4]苏敬德.;远动设备的防雷及抗干扰[J]
- Application of FBD-method to real-time current detection in three-phase four-wire system[J].Electric Power Automation Equipment,2006,26(8):36-39. FBD法在三相四线制系统电流实时检测中的应用[J].;电力自动化设备;2006;26(8):36-39
- Discussion on the application of NTP in the time synchronization of power automation devices.Automation of Electric Power Systems,2005,29(15):93-95. NTP在电力自动化设备时钟同步中的应用探讨.;电力系统自动化;2005;29(15):93-95
- SHEN Jian-shi, HU Hao-ming.The Interturn Protection for Large-sized EHV Parallel Connection Reactor.Electric Power Automation Equipment, 1982, 2(2): 9-13. [1]沈建石;胡浩明.;大型超高压并联电抗器的匝间短路保护
- HU Ci-dan,HU Kun-ling.The telemetering rides the coefficient the improvement and the unification[J].Electric Power Automation Products Information,2003 (10):43-45. [10]胡慈丹;胡昆岭.;遥测乘系数的改进和统一[J]
- Hu Yunhua,Zhao Shuqiang.Analysis of damping couping relation between LFO and SSO of power system[J].Electric Power Automation Equipment,2004,24(9):15-17(in Chinese). [7]胡云花;赵书强.;电力系统低频振荡和次同步振荡的阻尼耦合分析[J]
- SHEN Hong-tao,LOU Qi-he,WANG Ren,et al.Research on substation automation network communication system based on RTPS[J].Electric Power Automation Equipment,2005,25 (2):25-29. [9]沈洪涛;娄奇鹤;王牣;等.;基于RTPS的变电站自动化网络通信系统研究[J]
- WANG Feng-hua,HUANG Hai.Study on automatic switchover solution of Liexi substation's 110 kV system backup power[J].Electric Power Automation Equipment,2000,20(6):53-55. [1]王风华;黄海.;列西变110 kV系统备用电源自投方案研究[J]
- Yang Yan,Zhao Shuqiang.Load characteristics' effect on lowfrequency oscillation damping of power system[J].Electric Power Automation Equipment,2003,23(11):13-16. [13]杨艳;赵书强.;负荷特性对电力系统低频振荡阻尼的影响[J]
- YE Nian-guo.Get out of the wrong design for substation synchronization and reclosure[J].Electric Power Automation Production Information, 2003 (5): 11 - 16. [1]叶念国.;走出变电站同期和重合闸的设计误区[J]
- ZHOU Yao-yi, BAO Bin-shou.Remote autonation meter data reading system for low voltage electric power user.Electric Power Automation Equipment, 1999,19(2) :42 - 43. [3]周耀义;鲍滨寿.;低压电力用户远程自动抄表系统[J]
- The king was shorn of his power by his nobles. 国王被手下的贵族们剥夺了权力。
- HUANG Zhiwei , YAN Zheng , CHEN Yunping , et al .Dist ribution system integrated automation in power marketenvironment . Elect ric Power Automation Equipment , 2004 ,24 (5) : 79283. 黄志伟;严正;陈允平;等.;电力市场环境下配电系统综合自动化探讨
- ZHOU Yu-sheng,ZHOU You-qing,DAI Zheng-zhi.Algorithm for fault section judgement in power distribution network based on FTU[J].Electric Power Automation Equipment, 2000,20 (4): 25 -27. [5]周羽生;周有庆;戴正志.;基于FTU的配电网故障区段判断算法[J]
- ZHENG Hong-yan.The advantage and importance of type 11 microprocessor-based phase spacing protection used as farranging back-up relaying[J].Electric Power Automation Equipment, 2000, 20 (2): 29 - 31. [2]郑宏彦.;11型微机相间距离保护用作远后备的优越性及重要[J]