您要查找的是不是:
- prefabricated driven pile 预制打入桩
- The driveability analysis is a key in the optimized design method for driven pile. 2、基桩可打性分析是打入桩优化设计方法的关键环节。
- If the driven pile option is adopted, raking piles can be driven to counter-act the earth pressure. 假如采用打入桩,则可打入斜桩,以抵挡土压力。
- When the hammer weight is constant, efficiency of driving pile can be increased by means of selecting drive cap and cushion padof different rigidity to match the hammer according to various geological condition and the pile. 在桩锤重量一定的情况下,可针对不同的地质情况和桩,通过选择不同刚度的桩帽和桩垫与其匹配来提高打桩效率。
- During hanging pile,following pile and driving pile the frame would be affected by multiple forces that would affect the intensity design and structure design of the frame. 在吊桩、送桩和打桩施工过程中,导向架会受到多种力的作用,这些力将对导向架的强度和结构设计产生重要影响。
- The prestressed hammer driven piles aided by water jetting were used as the substructure of a wharf, and transverse cracks were observed in the bodies of the five test piles. 摘要某码头工程下部结构采用预应力水冲锤击桩,试桩过程中发现,在贯入度较大的情况下桩身多处产生横向裂缝,使桩尖无法达到设计标高。
- A pile-driver is a mechanical device used to drive piles into soil to provide foundation support for buildings or other structures. 打桩机这种机械设备,是用来把桩子打进土里,给大楼和其他建筑物打地基用的。
- Abstract: according to the practice,the characteristics of technics of Follow-Pipe Driving pile are expatiated.The results of liquefaction-treatment are analyzed and evaluated usiing several methods. 文摘:通过具体工程实践,阐述了跟管夯扩桩法进行地基加固处理砂土液化的工艺特点,使用多种试验方法分析和评价了处理液化地基土层的效果。
- Half- Nondestructive Testing of Concrete Driven Pile 混凝土灌注桩的半无损性检测
- Time-effect of bearing capacity of driven pile in saturated soil 饱和软土中打入式预制桩单桩承载力的时效性
- Common problems of driven pile quality and countermeasures 常见的锤击桩质量问题及防治措施
- I've never seen a car being driven so recklessly. 我从没见过有人开车这么卤莽。
- How can I drive away these feelings of sadness? 我该怎样做才能驱散忧伤?
- Bill wave his hand to us and then drive away. 比尔向我们挥手告别后开车走了。
- The engines are driven by steam. 这些发动机是由蒸汽驱动的。
- The machines are driven by electric motors. 这些机器都是由电动机驱动的。
- The foundation of this design is prefabricated ferroconcrete pile foundation. 本设计的基础采用预制钢筋混凝土桩基础。
- In applying the method known as the "Berlin Building System", firstly, the open excavation is taken down to a depth of between 12 and 25 meters. Lines of driven piles and timbering support the sides of the excavation. 在应用所谓的"柏林建筑体系"方法时,可首先把地槽明挖至地下12-1 5米处,两壁用桩子和木架支撑。
- He was driven crazy by the extremity of pain. 极度的痛苦使他发狂。
- He was almost driven out of his mind with anxiety. 他焦急得差不多精神都错乱了。