pylon pier

  • 主塔墩

pylon pier的用法和样例:

例句

  1. The bored pile-group is used for the foundation of the main pylon piers and a drilling platform will be used as temporary facilities for construction of the pile foundation.
    主塔墩基础采用钻孔灌注桩群桩基础,采用钻孔平台作为桩基施工临时设施。

pylon pier的相关资料:

临近单词

目录 查词历史