您要查找的是不是:
- resources requirement plan 资源计划
- Responsible for material requirement plan, and issuing purchasing order for the materials according to leadtime. 负责材料需求计划并根据采购提前期下达材料订单。
- Has officer described resources required (funds, staff, other)? 是否描述了资源的需求(资金、人员、其他)
- Audit the spare part requirement plan pulled by preentatie maintenance; control the sum of spare parts storage within the limits. 审核由预防性维修主要拉动的的备件需求计划,控制备件库存金额在年度目标内。
- Anywhere, there are no fixed resources required (like a Forge or Moonwell). 任何地方,并不像裁缝和锻造那样需要月亮井和熔炉。
- The company has all the resources required to develop very exciting projects. 本公司拥有世界级的项目所需要的一切开发资源。
- Resource Requirement Planning 资源需求计划
- Identify internal audit resource requirements. 识别内部审计资源需求。
- It provides a level playing field for all,and the human resources required for further economic development. 为市民提供平等参与社会竞争的机会,为香港的经济发展培育人才。
- Congeneric species will have the most similar resource requirments. 同源物种对资源的要求最相似。
- CCRP Corporate Capacity Required Planning Visibility Logistic. 公司的能力管理系统。
- Lead team to set up project target, including Quality, Cost, timing planning and resource requirement. 领导项目小组完成质量、成本、费用以及期限目标,并按阶段进行项目跟踪和项目管理;拟定、优化、调整计划并确定资源上的需求;
- The application-tier server and data-tier server can be deployed on one server or two servers which affects the server requirement planning. 应用层服务器和数据层服务器既可以部署在一个服务器上,也可以部署在两个服务器上,不同的部署将影响服务器要求计划。
- The constraints are computable, but the resources required to check them are beyond the access of the program. 限定元素可以计算,但是程序无法访问检查它们所需要的资源。
- Manpower Allocation Requirement Plan 人力分配需求计划
- We aim to identify which old urban areas need to be renewed and set out their priority and resources required. 我们的目的,是要确定那些旧区须要重建,同时订定它们的先后次序和所需的资源。
- In order to verify the feasibility of MRP algorithm, the capability requirement planning algorithm is analyzed in this paper. 为对物料需求计划的可行性进行检验,对能力需求计划算法进行了理论分析和探索研究。
- And can be used to create an emitter and all the appropriate resources required to send events asynchronously. 它可以用来创建发射器,以及异步发送事件时需要的所有适当的资源。
- Assist team to set up project target, including Quality, Cost, timing planning and resource requirement. 协助项目小组完成质量、成本、费用以及期限目标,并按阶段进行项目跟踪和项目管理;拟定、优化、调整计划并确定资源上的需求;
- Standard costs are predetermined costs of resources required to make a product or provide a service. 标准成本是指预先确定的制作某种产品或提供一项服务所需的资源数量。