您要查找的是不是:
- risk cause analysis 风险成因分析
- Cause Analysis and Control of Cracks in C. 火电工程中电缆隧道裂缝原因分析及控制。
- Cause Analysis of Cracks in Steam Turbine. 汽轮机转子裂纹原因分析及运行安全措施。
- Risk analysis should follow the principle of "root cause analysis" and adopt different framework. 风险分析应遵循“根原因分析”的原则,可以采用不同的分析框架。
- Cause Analysis and Treatment on MFT Actuation in Commissioning Pha. 锅炉调试期间MFT动作的原因分析及其处理。
- Cracking cause analysis of the U shaped tube heat exchangers. U形管换热器开裂原因分析
- Through the cause analysis on the trip fault of AC filter breaker of Jiangling Converter Station, the hidden risk in GIS equipment was discovered. The tentative resolving measure was raised. 通过对江陵换流站交流滤波器开关跳闸故障原因的分析,发现gis组合电器存在的重大隐患,提出了初步解决办法。
- STDM is presented in four modules: Root Cause Analysis, Decision Making, Plan Analysis, and Situation Review. 本课程分为四个模块:情景分析、原因分析、决策制定、计划分析。
- Demonstrated knowledge of engineering statistical process control and root cause analysis. 具备相关统计过程控制及根本原因分析的知识;
- Cause Analysis and Solution to Slagging in Boiler No. 1 of Hengfeng Power Generation Co. Ltd. 衡丰发电有限责任公司%231炉结渣原因分析及解决措施。
- Do not connect the orange wire to the permanent 12V, otherwise you risk causing the vehicle batterie to go flat. 请与汽车制造商联系;确认您的车中是否安装了附加放大器.
- Cause analysis of an argon-affected asphyxiation accident and preventive measures to be taken. 氩气窒息事故原因分析及防范措施。
- It is the real difficulty to assess the aftereffect of supply chain risk caused by uncertain contingent events. 不确定偶发风险事件导致的供应链风险后果的估计是风险估计的难点所在。
- These must be added to ensure consistency between these various products of a root cause analysis. 这些事件或情况必须附加上去以确保根本原因分析不同结果的一致性。
- Event is raised after the entire document has loaded; if you use the DOM before then, you risk causing a run-time exception in your application. 事件;如果您在此之前用过DOM,则有导致应用程序中出现运行时异常的风险。
- Follow up quality issue with suppliers and process root cause analysis to corrective and preventive actions. 追踪供应商的质量问题,进行根本原因分析,确定纠正和预防措施。
- Secondly, aimed at different risk causes, it is necessity to look for advanced science methods to raise the rationality of risk causes weights. 因此有必要寻找先进科学的方法以提高权重分配的合理性。
- Leading problem solving and root cause analysis team consist of QC, PE and Design engineer. 领导由质量控制工程师,工艺工程师和设计工程师组成的质量问题解决和根源分析队伍。
- The distributions of tillable field and population were used as the economics index to zone the hazard risk caused by flood. 以耕地和人口为经济因素指标,考虑洪水造成的灾害,制作成洪灾危险程度区划图。
- The distributions of tillable field and population are used as the economics index to zone the hazard risk caused by flood. 以耕地和人口为经济因素指标,考虑洪水造成的灾害,制作成洪灾危险程度区划图。