safety pillar
英
美
- 保安矿柱
safety pillar的用法和样例:
例句
- As a result,the short hole shrinkage method with flat bottom structure was employed to mine the stope firstly,then stoping ore pillar by medium length hole caving method.
后沟金矿采用平底结构浅孔留矿法先采矿房,后用中深孔崩落法回采矿柱,经两年多的生产实践,取得较好的技术经济指标。 - The results of numerical simulation showed that if the floor pillar is mined partially, the stress in pillars will sharply increase, so integral stability of mine may weaken.
模拟结果表明,部分底柱抽采后,起关键支撑作用的底板横撑和矿柱中的应力有显著地变化,这可能破坏矿山整体稳定性。