您要查找的是不是:
- spring loaded needle valve 弹簧加载式针阀
- Forward needle valve positions for easy access. 针形阀位置提前,便于接近。
- Bolt torques control total spring load. 螺栓扭矩控制所有的弹簧负载。
- Control supply line water pressure. Install a soft seated, spring loaded, check valve upstream of the assembly. 控制供应管道的水压。在总成的上游安装一个软阀座,弹簧负载止回阀。
- The delivery pressure acting on the spring loaded diaphragm throttles the balanced valve to control the pressure. 水输出压力在弹簧负载隔膜的作用下对平衡阀进行节流调节,以控制水压。
- Attach vent (yellow) hose to TC#4 and vent needle valve. 连接排气(黄)软管到测试旋塞4号和排气针形阀上。
- Open TC#3, needle valve "B ", and vent needle valve. 开启测试旋塞3号,针形阀“B”,和排气针形阀。
- Key removable in locked position only. Spring loaded clip-in pawl. 只能在锁住位置时取出钥匙,弹簧加载的嵌入式掣子。
- Open TC#2 and needle valve "A", close needle valve "A" and TC #4. 开启测试旋塞2号和针形阀“A”,关闭针形阀“A”和测试旋塞4号。
- Close needle valve "A" high side (red) and open test cock No. 2. 关闭针形阀“A”高端(红),并开启测试旋塞2号。
- Cushion spring loaded plastic grips.Steel plate spring.Non-bevelled... 电子剪刀产品型号:Electronics ShearGround carbon steel blades.
- All needle valves must be closed on test kit. 检测组件上的所有针形阀必须关闭。
- Spring loaded for fast closure, eliminating reverse flow slam and water hammer. 负载弹簧用于快速关闭,消除逆流冲击和水锤。
- Open vent needle valve and bleed air from hose. Then close vent valve. 开启排气针形阀,并从软管排放空气。然后关闭排气阀。
- Open vent needle valve fully until dripping from vent connection stops. 完全开启排气针形阀直到从排气连接处的滴漏停止为止。
- EZ twist relief valve cover-quarter turn locking joint captures the spring load during repair to facilitate disassembly. 将安全阀阀盖扭转四分之一转,锁定连接恢复弹簧负载,使得维修期间便于拆解。
- Open test cock No. 2 and needle valve "A" high side (red) on test kit. 开启测试旋塞2号和检测组件上的针形阀“A”高端(红)。
- The spring load is captured by the two spring retainers and the stem. 通过两个弹簧固定器和阀杆可以恢复弹簧负载。
- The FLX-FF4 control check valve is primarily designed for installaton in pump discharge piping where it functions as a spring loaded silent check valve,balancing valve and shut-off valve. FF4控制止回阀在管路中连接在泵的输出端,可以替代泵输出端的消音止回阀、调节阀以及关断阀。
- Before starting test all needle valves must be closed. 在开始检测之前,所有阀门都必须关闭。