您要查找的是不是:
- Construction of a section of the Sheung Shui to Lok Ma Chau Spur Line railway. 建造上水至落马洲支线铁路的其中一段。
- More details regarding our full objection to the Spur Line EIA report. 有关本会对支线环评报告的反对意见全文。
- Visitors can travel to from the Lok Ma Chau Spur Line Control Point via KCR Lok Ma Chau Spur Line. 旅客可选择乘搭九广铁路落马洲支线往来落马洲支线管制站。
- Construction work on the Lok Ma Chau Spur Line Control Point has almost been completed. 落马洲支线管制站的建筑工程已大致完成。
- He was concerned that the Spur Line might not be able to alleviate the overcrowding problem at Lo Wu Station. 他关注到,支线未必可以纾缓在罗湖站过分挤塞的问题。
- The KCRC is planning and implementing West Rail (Phase I),the Ma On Shan rail link,the TST Extension and the Sheung Shui to Lok Ma Chau spur line. 九广铁路公司现正进行西铁(第一期)、马鞍山铁路、尖沙咀支线和上水至落马洲延线的规划和实施工作。
- The demand for this line would depend on how quickly the additional capacity provided by the Spur Line would be taken up. 此快线的需求,将视乎有关支线所提供的额外载客量会否很快达致饱和而定。
- The Railway Development Office co-ordinates the implementation of the Sheung Shui to Lok Ma Chau Spur Line and the Kowloon Southern Link. 铁路拓展处负责协调多项铁路计划的实施,包括:上水至落马洲支线及九南线。
- The Appeal Board confirmed the decision of DEP not to approve EIA report for the Spur Line and not to issue EP for the project. 上诉委员会确认环保署不批准支线的环评报告,以及不签发环境许可证予有关工程的决定。
- The KCRC is planning and implementing West Rail (Phase I), the Ma On Shan rail link, the TST Extension and the Sheung Shui to Lok Ma Chau spur line. 九广铁路公司现正进行西铁(第一期)、马鞍山铁路、尖沙咀支线和上水至落马洲延线的规划和实施工作。
- The 7.5-kilometre Sheung Shui to Lok Ma Chau spur line,that will connect the KCR at Sheung Shui with a new passenger rail boundary crossing at Lok Ma Chau. 上水至落马洲延线全长7.;5公里,连接九广铁路上水站和落马洲的新铁路过境通道。
- To meet cross-boundary traffic demand,we are also planning to build a spur line which will connect the KCR at Sheung Shui with Lok Ma Chau,for completion in 2004. 为了应付日益增加的过境乘客量,我们也会建设一条连接上水和落马洲的九广铁路延线,并预期会在二零零四年完成。
- The Panel met with the transport trades to receive views on traffic and transport arrangements for the commissioning of the Sheung Shui to Lok Ma Chau Spur Line. 事务委员会与运输业界举行会议,听取他们对上水至落马洲支线通车后的交通及运输安排的意见。
- FC approved the resubmitted proposal for a remuneration package for the Chairman of the Appeal Board appointed by CE to hear the appeal case on the Spur Line project. 财委会批准当局重新提交的获行政长官委任聆讯支线工程计划上诉个案的上诉委员会主席酬金方案。
- FC considered a proposal for a remuneration package for the Chairman of the Appeal Board appointed by CE to hear the appeal case on the Spur Line project. 财委会考虑获行政长官委任聆讯支线工程计划上诉个案的上诉委员会主席的酬金方案。
- The Administration provided supplementary information on traffic and transport arrangements for the commissioning of the Sheung Shui to Lok Ma Chau Spur Line. 政府当局向委员提供有关上水至落马洲支线通车后的交通及运输安排的补充资料。
- The 7.5-kilometre Sheung Shui to Lok Ma Chau spur line, that will connect the KCR at Sheung Shui with a new passenger rail boundary crossing at Lok Ma Chau. 上水至落马洲延线全长7.;5公里,连接九广铁路上水站和落马洲的新铁路过境通道。
- To meet cross-boundary traffic demand, we are also planning to build a spur line which will connect the KCR at Sheung Shui with Lok Ma Chau, for completion in 2004. 为了应付日益增加的过境乘客量,我们也会建设一条连接上水和落马洲的九广铁路延线,并预期会在二零零四年完成。
- She went to London on the spur of the moment. 她一时兴起就到伦敦去了。
- The army rode with whip and spur to their rescue. 战士们快马加鞭地赶去营救他们。