您要查找的是不是:
- A study on conceptual design of airport terminal building. 机场旅客航站楼的概念设计。
- From the terminal building Keycase returned to the parking lot. 奇开斯从终点大楼回到停车
- I saw Kruger leaning against a wall in the terminal building. 我看见克鲁格靠在终点站大楼的墙上。
- Customer:Excuse me,but are there any baggage lockers in this terminal building? 顾客:对不起,在这栋终点大楼有行李保管吗?
- The paved strip in front of and around airport hangars and terminal buildings. 停机坪飞机机库及建筑物端饰前及周围的铺过的临时跑道
- The Denver International Airport features a terminal Building roofed by a white membrane stretched from steel masts. 丹佛国际机场的特色就是航站的屋顶是用钢杆撑起的白色薄膜。
- Hainan Airlines offers you free buses to downtown in front of the terminal building. 海南航空在候机楼前面会提供免费汽车送您去市区。
- Leave plenty of the terminal building for turning to avoid jet blast to the people. 离开候机楼远一点,转弯时以免吹人。
- The passenger terminal building, with a gross floor area of 516 000 square metres at airport opening, dominated the landscape on Chek LapKok. 客运大楼拔地而起,现已成为赤角景观的焦点。到机场启用时,大楼将有516000平方米楼面开放启用。
- The roof of Beijing Capital Airport T3 Terminal Building adopted large-span hyperboloid steel grid structure. 北京首都机场T3航站楼屋顶为大跨度双曲面钢网架结构,吊顶采用半开放的金属条形板。
- The deplaning passengers follow the passenger service agents into the large terminal building. 下飞机的乘客跟着乘客服务代表进入巨大的机场大厦。
- The passenger terminal building where they stand, passenger and freight traffic through the riverside tramway. 客运大楼拔地而起,客货缆车分道直通江边。
- The passenger terminal building,with a gross floor area of 516 000 square metres at airport opening,dominated the landscape on Chek LapKok. 客运大楼拔地而起,现已成为赤角景观的焦点。到机场启用时,大楼将有516000平方米楼面开放启用。
- Persons being in the Closed Area after entering Hong Kong via the Passenger Terminal Building, for the sole purpose of returning to Shenzhen. 仅为返回深圳,经由旅检大楼进入香港后身处禁区内的人。
- I don't know how to get there. But it would be easier to take taxi. There are lots of taxis parking outside the terminal building. 我不知道怎么去那里。但叫一辆出租车比较方便。有许多出租车停在后机楼旁边。
- The paved strip in front of and around airporthangars and terminal buildings. 停机坪飞机机库及建筑物端饰前及周围的铺过的临时跑道。
- Next to the new terminal building will be decorated inside and outdoor plaza, street drainage systems construction phase. 接下来将是对新航站楼内部的装饰和户外广场、路灯排水系统等建设阶段。
- Tangshan is a dual-use of the new airport, now only dormitory and the terminal building, not around the demolition project and the major earthworks. 市区新华道拆迁马上完成;启新立交桥下有大批民房正在拆除.
- There will also be a Public Transport Interchange adjacent to the passenger terminal building at the new control point for access by other means of transport. 新管制站的旅检大楼毗邻将设置一个运输交汇处,方便各类公共运输车辆使用。
- Is available on 5th Floor, Departure Level, Main Terminal Building, between the International Check-In Counters and the Singapore Shuttles Check-In Counters respectively. 设在机场候机大楼5楼出发大厅,分别位于国际办理登机柜台和新加坡航空办理登机柜台之间。