您要查找的是不是:
- During construction period, the Danjiangkou Dam still plays the role of flood control.Therefore, it is important to balance the dam heightening construction and flood control realization. 丹江口大坝初期工程在大坝加高施工期间仍然承担着汉江中下游防洪任务,妥善解决好丹江口大坝加高工程建设的顺利进行与初期工程的防汛度讯、正常运行管理关系,意义重大。
- Downriver Scouring Pit Origin Analyzed in the Project of Raising the Danjiangkou Dam 丹江口大坝加高工程下游河床冲刷坑成因分析
- the Danjiangkou Dam 丹江口大坝
- The Danjiangkou water control project is the first gigantic dam being built on the Hanjiang River. 丹江口水库是建国初期建成的多目标综合利用的大型水利工程。
- The construction method for removing the old concrete of Danjiangkou Dam are described. 介绍丹江口大坝旧混凝土拆除的几种施工方法。
- The briefing on design work of Danjiangkou dam heightening and several key techniques concerned are described. 介绍了丹江口大坝加高设计工作简况、特点及加高设计中几个关键技术问题的处理措施。
- In order to make full use of existing Danjiangkou Dam safety monitoring data, a dam monitoring data warehouse is established. 为充分利用丹江口大坝现有人工和自动化采集的大坝安全监测数据 ,建立了大坝监测数据仓库。
- The problem of combination between the new and existing concrete need to be solved in Danjiangkou dam heightening project. 丹江口大坝加高工程中需解决新老混凝土的结合问题。
- Danjiangkou dam heightening project is another model for dam construction in China's hydropower industry, and it has a special meaning. 摘要丹江口大坝加高工程是中国水电行业中又一种建坝模式,有其特殊意义。
- In the Danjiangkou Reservoir area, eutrophication is the major pollution. 富营养化是丹江口水库污染治理的重点。
- The turning section of the concrete dam on the right bank of Danjiangkou dam shows and ogee on plane, of which periodical deformation occurs under the impact of temperature for a long period. 摘要丹江口大坝右岸混凝土坝转弯坝段在平面上呈凸向下游的反弧形,在气温长期影响下出现周期性变形。
- The turning section of the concrete dam on the right bank of Danjiangkou Dam shows an ogee on plane, of which periodical deformation occurs under the impact of temperature for a long period. 丹江口大坝右岸混凝土坝转弯坝段在平面上呈凸向下游的反弧形,在气温长期影响下出现周期性变形。
- Xichuan the Danjiangkou Reservoir is the source of North Water Transfer Project. 淅川的丹江口水库是南水北调中线工程的源头。
- The Danjiangkou reservoir is the water source area of the middle route project of S-N water transfer. 丹江口水库为南水北调中线工程水源地。
- Here from the Wudang Mountain about 50 kilometers from the Danjiangkou Reservoir less than 30 km. 这里距离武当山大约50公里,离丹江口水库不到30公里。
- The impacts of the Danjiangkou Reservoir on ecosystems of the middle and lower reaches of the Han River were further analyzed. 进一步分析了丹江口水库的修建对汉江中下游生态水文的影响。
- Immigration from the Danjiangkou area for the construction of the hydro project involves people from both Hubei and Henan's Xichuan. 丹江口库区移民分属湖北、河南两省,其中河南库区移民全部集中在淅川县,涉及人口16万。
- Water resources in the Danjiangkou Reservoir shall be maintained at a good quality for the future water diversion by means of optimized ... 通过合理规划、严密监控、科学治理,丹江口水库的水质将能够长期处于优良水质状态,满足调水要求。
- The dam burst under the weight of water. 那水坝在水的压力下决口了。
- Based on the geological result of the scour pit of the Danjiangkou Project,it is expounded that rock mass characteristics are the internal factor in the formation of scour pit. 以丹江口工程冲刷坑地质调查成果为例,阐述了岩体特征是影响冲刷形成的内在因素。