您要查找的是不是:
- the prestressed tubular piles 预应力管桩
- Precautions and Measures Against the Float Upward of Prestress Tubular Pile 预应力管桩上浮的预防及处理
- Causal analysis and prevention measure of damage of high strength prestressed tubular pile during construction 高强预应力管桩施工破损原因分析和预防措施
- Application of prestressed tubular pile to reinforcing soft soil subgrade on passenger dedicated railway line 预应力管桩在客运专线软土路基中的应用
- prestress tubular pile 预应力管桩
- PHC prestress tubular pile PHC预应力管桩
- prestressed tubular pile 预应力管桩
- Then the prestress of the piles was adjusted to the designed value in prefabrication, and good effect was achieved. 提出适当调整预应力,能够有效地解决预应力水冲桩桩身裂缝的问题。
- The technology for construction of steel tubular pile caps is described in the. 文章主要介绍钢管桩桩帽的施工工艺。
- Then the prestress of the piles was adjusted to the designed value in prefabrication,and good effect was achieved. 提出适当调整预应力,能够有效地解决预应力水冲桩桩身裂缝的问题。
- Research is done on slow change of concrete-filled steel tubular constriction and prestress loss caused by concrete shrinkage.The parsing formula of the prestress loss is deduced. 摘要对钢管混凝土收缩徐变和预应力筋松弛引起的预应力损失进行了研究,推导出了该项预应力损失解析式。
- Prestressed Tubular Concrete (PTC) pile PTC预应力管桩
- The prestressed hammer driven piles aided by water jetting were used as the substructure of a wharf, and transverse cracks were observed in the bodies of the five test piles. 摘要某码头工程下部结构采用预应力水冲锤击桩,试桩过程中发现,在贯入度较大的情况下桩身多处产生横向裂缝,使桩尖无法达到设计标高。
- prestressed reinforced concrete tubular pile 预应力管桩
- As a new joist technique of concrete pipe pile, the prestressed concret e pile mechanical bond express joint has been used in engineering nowadays. 预应力混凝土管桩机械快速接头作为一种新型的管桩连接技术,近年在工程中时有使用。
- large diameter prestressed concrete tubular pile 大管桩
- prestressed concrete tubular pile 预应力混凝土管桩
- We put the books in piles on the floor. 我们把书在地板上堆起来。
- When installing steel tubular piles in regions where granite is shallowly overburdened, the piles are easy to deviate and the pile tip is easy to warp, resulting in slow driving. 摘要在浅覆盖层花岗岩地区进行钢管桩施工,存在易偏位、桩尖易卷口和进度慢等技术难题。
- Abstract:The prestressed hammer-driven piles aided by water jetting were used as the substructure of a wharf,and transverse cracks were observed in the bodies of the five test piles. 摘要:某码头工程下部结构采用预应力水冲锤击桩,试桩过程中发现,在贯入度较大的情况下桩身多处产生横向裂缝,使桩尖无法达到设计标高。