您要查找的是不是:
- The dam burst under the weight of water. 那水坝在水的压力下决口了。
- In case of flood, the dam can protect us. 在发洪水的时候,大堤可以保护我们。
- Millions of gallons of water are kept back by the dam. 这个堤坝拦住了滔滔的洪水。
- The dam is too weak to withhold the pressure of the rising water. 水坝不够牢固,抵挡不住水上涨的压力。
- It is assumed that the damming of the Three Gorges next year will not do harm to the scenery. 预定于明年进行的长江三峡截流,不过对三峡经管造成大的影响。
- The dam eventually yielded and collapsed under the weight of water. 水坝在水的压力下终於决口。
- Recently,I have witnessed the damming of the Yangtze River on television. The grandeur impressed me a great deal. 最近,我从电视上看到了长江截流的新闻,其壮观的场面令我很激动。
- Recently, I have witnessed the damming of the Yangtze River on television. The grandeur impressed me a great deal. 最近,我从电视上看到了长江截流的新闻,其壮观的场面令我很激动。
- On the other side of the Atlantic, the damming of African rivers has led to the spread of human blood flukes that depend on snails as a host and cause human schistosomiasis. 在大西洋的另一边,由于非洲河川建了水坝,导致以螺类为寄主的人类血吸虫到处散播,引发人类的血吸虫病。
- The dam can withhold the pressure of the water. 大坝可以阻挡水的压力。
- The village was swept away when the dam burst. 村庄在水坝决堤时被冲走了。
- The dam of the sire is “Reflection” a direct daughter from Myrtle Lofts famous breeding pair “Jester” &“Carrie”. “乔彼特”的母亲是“印象”,米尔特鸽舍著名育种搭档“加斯特”&“加丽”的直女。
- A section of the dam has caved in. 大坝出现塌方。
- First phase : 1993-1997 (five years): Project preparation and first stage of construction, culminating in the damming of the Yangtze River in November 1997. 第一阶段:(1993-1997)(五年时间)项目准备及第一阶段建设,到1997年11月封坝。
- However, they shrank to just 760 square kilometres during the 1980s, after Saddam ordered the damming of the rivers that sustained the marshes in an attempt to drive out rebels. 然而,上世纪80年代,湿地面积缩小到760平方公里,因为萨达姆命令在支撑湿地的河流上进行拦河修坝以驱逐叛乱分子。
- The water deepened after the dam was built. 堤坝建成后水已加深。
- The dam was in danger because of the rising flood. 洪水猛涨,大坝告急。
- The dam of Dongtang Reservoir is a rockfill dam with asphaltum concrete core, the hight of the dam is 46 m, and the width of the core is 0.5m. 洞塘水库枢纽工程设计坝高 46m;为沥青混凝土心墙石渣坝 ;心墙厚度为 0 .;5m。
- The dam of the Dahuashui hydroelectric project is a RCC double curvature arch dam with gravity buttress on the left bank with a dam height of 134.50m. 大花水水电站拦河大坝为抛物线碾压混凝土双曲拱坝+左岸重力墩;最大坝高134.;50m;是目前国内在建的最高的碾压混凝土双曲拱坝。
- Jieyin Temple <>Built against the cliff, the magnificent and grand temple is on the lft side below the dam of Qingtantou Reservoir in Yanjiang town. 接引寺接引寺在沿江镇清潭头水库坝下左侧,寺悬崖而建,峻险壮丽。