您要查找的是不是:
- timber shear wall 木剪力墙
- RC shear wall has been widely used in various structure systems. 摘要混凝土剪力墙被广泛运用于各类结构体系中。
- The frame should work together with shear wall in the frame-shearwall structure. 摘要框剪结构是一种常见的建筑结构形式。
- The rigid arm CC is simply a statement that the "plane sections" hypothesis may be applied to the shear wall. 刚臂CC只是说明了在剪力墙中可以应用“平截面”假设。
- A develop, emt are undertaken to derive a series of new element stiffness matrixes for column and shear wall which have rigid link or not. 为此本文着重利用稳定函数分析梁柱效应对杆单元刚度的影响,并推导出一系列带刚域或不带刚域的柱和剪力墙的新的单元刚度矩阵。
- Axial-load ratio is a vital element affecting the seismic behavior of the shear wall and deciding its ductility. 摘要轴压比是影响剪力墙抗震性能的一个主要因素,直接决定其延性性能。
- RC shear wall with bi-directional single row of steel bars is applicable for multistory residence building. 双向单排配筋剪力墙结构适用于多层住宅结构。
- Short pier RC shear wall structure system with concealed bracings was put forward. 提出了钢筋混凝土带暗支撑短肢剪力墙结构体系。
- The top plate dismantling beforehand system in cast-in-place shear wall structure provides a practical method. 而现浇剪力墙结构顶板早拆体系为解决这些问题提供了一个可行的方法。
- Abstract: The frame should work together with shear wall in the frame-shearwall structure. 摘要:框剪结构是一种常见的建筑结构形式。
- The height of the structure has small influences to the interruptable shear wall height. 结构高度对中断剪力墙高度的影响较小.
- The centralize wind-load of all floors, the anti-side stiffness of the column and the shear wall have been computed. 计算各楼层集中风荷载标准值;
- The failure test of reinforced masonry shear wall with block strength above 20MPa and shear span over 1wa s conducted for the first time in Chin a. 本文试验为砌块强度超过20MPa;剪跨比大于1.;0的配筋砌块剪力墙抗剪试验。
- The shear walls are arranged in both directions (across and longitudinally). 剪力墙双向设计(横向和纵向)。
- The firm's tender for the supply of timber has been accepted. 那家商号的供应木材投标已被接受。
- A kind of new structure-slitted shear wall structure with heat preservation formwork by GHB (glazed hollow bead) was introduced. 摘要运用有限元分析方法,对玻化微珠保温墙模复合剪力墙进行非线性分析。
- Narrator: For three days, Kratos climbed the shear walls of the mountain. 讲述者:“经过了三天三夜,克瑞托斯终于攀登到了那通体是山的神殿旁。
- These methods are: diagonal braces, shear walls, and joint rigidity (frames). 这些方法有:对角撑,剪力墙,连接刚度(框架)。
- He's being talked up as presidential timber. 人们说他具有当总统的气质。
- At the same time for different axial-loads the RC shear wail with concealed steel truss can improve the seismic behavior of the shear wall. 不同轴压比下内藏钢桁架混凝土组合剪力墙均能明显提高钢筋混凝土剪力墙的抗震性能。