您要查找的是不是:
- The layout of underground power house of Baise project is limited by the special geologic condition. 百色水利枢纽地下厂房布置受地质条件的限制性较强。
- In this layout, the diversion tunnel adopts the two-machine, the two-tunnel and underground power house, and the tailrace tunnel adopts the two-machine and one-tunnel. 尾水洞为两机一洞布置,两个进水口布置在二期厂房与白山水库泄洪洞冲坑之间的左崖山体处;
- The cavern layout of underground power house of Baise project 百色水利枢纽地下厂房洞室布置
- Yele Hydroelectric Project Underground Power House Support Design 冶勒水电站地下厂房支护设计
- In this paper, a self-made geomechanics model material (MSB) is used for exerting normal load in the direction of actual principal stress on the round sides of the vertical plane stress model of large buried underground power houses. 本试验利用自制的地质力学模型材料(MSB),在窑洞式地下厂房的立式平面应力模型的周边上,按实际主应力方向进行加载。
- Study on Rocky Wall Crane Beam in Underground Power House 地下厂房岩壁吊车梁结构研究
- Briefing of Substitution of Softrock in Shuibuya Underground Power House 水布垭水电站地下厂房软岩置换简介
- Underground Power House Complex Layout of A Hydroelectric Power Station 某水电站地下厂房洞室群布置
- Ventilation model test and numeral value calculation of the underground power house of BMPDP 百色水利枢纽水电站地下厂房通风模型试验及数值计算
- Supervisory Work for Excavation Construction of Underground Power House of Zhouning Hydropower Station 周宁水电站地下厂房开挖施工监理
- Summary of the design of rock wall crane beam in underground power house of the Baise WR pivotal project 百色水利枢纽地下厂房岩壁吊车梁设计综述
- Mechanical analysis and design of crane beam on rock wall for underground power house 地下厂房岩壁吊车梁的力学分析及设计
- Experiment on initial stress of underground power house and bifurcated pipe section in Shuanggou station 双沟蓄能电站地下厂房及岔管段地应力试验研究
- ROCK BURST COMPREHENSIVE FORECASTING METHOD FOR THE CHAMBER GROUP OF UNDERGROUND POWER HOUSE 地下厂房洞室群岩爆趋势综合预测方法
- Application of the Theory of New Austrian Tunneling Method to Longtan Underground Power House 新奥法理论在龙滩地下厂房的应用
- Construction control for engineering geologic body of underground power house chambers 地下厂房洞室群工程地质体施工控制
- Analysis on Productive Test of Tensile Anchorage Bar in East Side-wall of Underground Power House of Dongping Hydroproject 洞坪水电站地下厂房东端墙张拉锚杆生产性试验分析
- Each member of the football team is power house. 橄榄球队的队员个个都牛马高大。
- Design of Pre-stressed Anchor Cable with 1 500 kN for Arch Crown of Underground Power House of Laxiwa Hydropower Station 拉西瓦水电站地下厂房顶拱1 500 kN预应力锚索设计与施工应用
- Analysis and design of dynamic and static forces of underground power house structure of Tianhuangping Pumped-storage Power Station 天荒坪电站地下厂房结构动静力分析及设计