您要查找的是不是:
- ungated spillway 无闸门溢洪道
- The spillway face are RCC benched spillway face. 溢流坝面为碾压混凝土台阶式溢流面。
- Dongfeng hydropower station is open ski spillway. 东风水电站溢洪道为明流滑雪式溢洪道。
- The importance of a safe spillway cannot be overemphasized. 安全溢洪道的重要性无论怎样强调也不会过分。
- The spillway is opened and the flood runs down rapidly. 泄洪闸打开了,洪水奔流而下。
- The typical seepage flow field of the bottom for the spillway dam is obtai... 最后计算了典型的坝基渗流流场,计算结果与实验结果吻合较好。
- The spillway can't be blocked, otherwise it will cause a serious problem. 不能堵塞洩洪道,否则后果不堪设想。
- The outflow through gate controlled multi-opening spillway of Yinhe Reservoir was analyzed.The analysis results were checked by the site observed data. 分析了音河水库多孔有闸门控制的溢洪道出流,并用出流的实测资料进行了检验。
- A major vertical fault scarp formed during the earthquake was less than 1000 ft from the spillway. 地震时形成的一个主要的垂直断层崖,离溢洪道不到1000英尺。
- The concrete placement for spillway and overflow weir at Dongba Hydropower Station employs light truss type formwork. 洞巴水电站溢洪道溢流堰的混凝土浇筑使用轻型桁架模板。
- The energy dissipation rate is 40 to 70% higher than that of the skimming spillway. 在试验范围内,台阶式溢洪道与光滑溢洪道比较,消能率可以提高40%25 ~70%25。
- Abstract: The flaring gate piers (FGP) are combines with the stepped spillway and stilling pool. 文章摘要: 将宽尾墩、阶梯溢流坝和消力池联合起来形成一体化的水工消能设施。
- The stepped spillway is interested by engineers due to its excellent function of energy dissipation and aerification. 台阶式溢洪道因其显著的消能、掺气效果而倍受工程界的关注。
- The torrent picked up buildings, animals, and human beings and sent them crashing down the spillway . 洪水沿路夹带建筑物残骸、动物及人进入洩洪道。
- The watertight seal of Changzhuang reservoir spillway tunnel is irregular and ageing, having caused severe leakage. 常庄水库泄洪洞伸缩缝极不规则且止水均已老化,渗漏严重。
- This strengthening scheme would have certain reference value to the later strengthening of this type spillway. 该加固方案对以后此类型溢洪道的加固具有一定的参考价值。
- Thus the structure type of the spillway and the anti-scour wall are demonstrated and is feasible and teasonable. 从而最终论证溢洪道及防淘墙结构布置形式在水布垭水利枢纽泄洪消能防冲系统中的可行性和合理性。
- The seismic stability analysis shows that the earthquakes are the main causes to quicken the spillway to break down. 然后考虑地震荷载进行结构抗震稳定分析,结果表明地震是加速溢洪道坝段失稳的重要原因。
- The concrete building of the spillway s steep slope section of the Qingshitan reservoir applied sliding form technique. 青狮潭水库溢洪道陡坡段混凝土浇筑,采用滑模技术,能加快施工进度,确保工程质量,保证了建筑物造型的准确和外观质量优良。
- This paper is a practical design example for water transmission pipeline outting across spillway of one city. 本文为某市输水管线跨越水库溢洪道的工程设计实例。