您要查找的是不是:
- What is a work breakdown structure? 什么是工作分析结构?
- CWBS Contract Work Breakdown Structure? 合同工作分解?
- Create a work breakdown structure from tasks in Microsoft Project. 在Microsoft Project中基于任务创建工作分解结构。
- Comprehending WBS and work breakdown structure system. 5理解WBS及工作分类结构系统;
- In project management, a work breakdown structure (WBS) is a method for analyzing a project's activities. 在项目管理中,工作分析结构(WBS)是用来分析项目活动的方法。
- A Microsoft Visio drawing is created that is a work breakdown structure chart of the tasks. 将创建一个Microsoft Visio绘图,该绘图是任务的工作分解结构图。
- A typical tool that is used by project managers is the work breakdown structure (WBS). 项目经理使用的典型工具是工作分解结构(WBS)。
- NPI Project leader will create WBS (work breakdown structure) with team member ASAP. 新产品导入领导人将和小组成员一起创建工作分解结构,明确职责。
- To map roles to persons is a main task for the project manager once the work breakdown structure has been defined in the abstract. 在工作分解结构抽象定义之后,将角色映射到人就是项目经理的主要任务。
- With Project, you can represent the work breakdown structure by using task IDs or by assigning your own WBS code to each task. 使用Project,可通过使用任务标识号或者向每项任务分配自己的WBS代码来表示工作分解结构。
- Work breakdown structure (WBS) (WBS: A hierarchical structure that is used to organize tasks for reporting schedules and tracking costs. 工作分解结构(WBS)(WBS:一种用于组织任务以便报告日程和跟踪成本的分层结构。
- The scope of this work must be defined in a work breakdown structure to a sufficient level of detail to enable project planning to be completed. 在工作分解结构中对此工作的范围的定义必须要详细到足以完成项目规划的程度。
- If you created a WBS code mask (code mask: The format that you define for a work breakdown structure [WBS] code or a custom outline code. 如果您创建了WBS代码掩码(代码掩码:您为工作分解结构(WBS)代码或自定义大纲代码定义的格式。
- Create a work breakdown structure code if you want to create your own WBS code mask that specifies the structure of WBS codes for your project. 创建工作细分结构代码-如果希望创建自己的WBS代码掩码以指定项目WBS代码的结构。
- Create the work breakdown structure with the team to develop the cost, schedule, resource, quality and procurement plans. 和团队一起建立工作分解结构,并开发成本、进度、资源、质量和采购计划。
- Templates could include work breakdown structure templates,scope management plan templates,and project scope change control forms. 样板可能包括工作分解结构样板、范围管理计划样板与项目范围变更控制表格。
- In SAP there are threetypes of cost objects: Cost Center, Internal Order, and WBS(Work Breakdown Structure) Element (see below for definition). 在SAP里有三种成本对象:成本中心、内部订单、WBS要素(项目管理)。
- Key Job Functions-Develops Work Breakdown Structure (WBS) in conjunction with Project Management Team and Team Leaders. ...... ... 公司名称:爱思特信息技术(上海)有限公司工作地点:上海市发布时间:2009-7-15
- Based on work breakdown structure (WBS), technical risks were identified and technical risk breakdown structure (TRBS) can be set up. 因为场馆建设过程中使用的技术和材料等比较新颖,因此缺乏历史数据和经验。
- Renumber custom work breakdown structure codes when you move or delete tasks and you want to reset the custom WBS field so that your tasks match the new structure. 重新编号自定义工作细分结构代码-如果要移动或删除任务,并重置自定义的WBS域使任务与新的结构相匹配。