Comparison among the results of BEAM, GPR, TSP and the actual case after cutting indicates that BEAM has a fairly good efficiency when there is ground water in the rock mass ahead of tunnel work face.
英
美
- 与地质雷达、TSP预报结果以及实际开挖情况进行对比表明,Beam对掌子面前方水体具有良好的探测效果。