For a project network with two or more paths with similar lengths, PERT will not be able to give accurate estimates of the mean duration and the duration for a given confidence level.

  • 若是网路中包含了两条或数条相近之要径天数路径,则PERT就无法确切预估某信心水准下完工之天数与平均完工天数。