It is shown that the distress resulted essentially from the instable integration and the in-coordinate deformation between the existing subgrade and the widening one.
英
美
- 病害的成因往往是多方面的,但新老路基之间的不良结合和不协调变形是最根本的,也是旧路拓宽工程中的主要控制机理。