The approach embankments, abutment walls and wing walls were constructed and surcharged prior to installation of the bridge seats, with the resultingload producing 8.5 inches of settlement.
英
美
- 在安装桥座前,引桥路堤、桥台墙和翼墙已经施工和对地基进行了预压,总沉降8.;5英寸。