The inner relation for the shunting and formation operation during every phase was studied and considered,and a mathematic model to estimate operation volume and hours was established.

  • 研究确定各阶段选编作业时分与划分车流批次的内在联系,建立估算作业量和作业时分的数学模型。
目录 查词历史