The measures to blocking the leak have fine result, for using the accelerated concrete, inflation to stop the leak, and monotube-double liquid grouting.
英
美
- 采用疏堵结合,先疏后堵的堵漏技巧、针对不同情况,以瞬凝混凝土、膨胀及单管双液注浆三种简易有效的堵漏措施,效果良好。