The problems and the solution of blast furnace tuyere in the casting are introduced. Measurements on lowering gasser and needle hole is analysed.

  • 介绍了高炉风口在铸造中遇到的问题和解决方法,讨论了降低气孔、针孔的工艺措施。
目录 查词历史