This paper introduces the prefabrication of ultra-long pile on water and piling construction for Phase II Project of Changshu Xinghua Port, which is jointly managed by China and Singapore.

  • 介绍中新合资常熟兴华港二期工程水上超长桩预制与沉桩施工工艺。
目录 查词历史