您要查找的是不是:
- China Southern Power Grid Corporation Ltd. 中国南方电网有限责任公司。
- AN POWER ELECTRONICS RESEARCH INSTITUTE. 西安电力电子技术研究所。
- An outline of Sunlight Procurement System of Guangdong Guang-Dian Power Grid Group Co., Ltd. 广东省广电集团有限公司阳光采购系统概述。
- Chencun Hydropower Station plays an important role in peaking and frequency modulation in power grid. 陈村水电站在电网的调峰、调频中起着重要的作用,同时水库也面临着防洪、灌溉等任务。
- In charge of the topics on wind power grid integration study. 负责风电接入电网分析方面的课题。
- Hit by the heavy storm, the power grid can not function properly. 受到暴风雪的影响,电力网不能正常运作了。
- Demand-side management (DSM) can improve power grid load property. 电力需求侧管理有改善电网负荷特性的作用。
- Computers are employed to monitor and control the power grid. 使用电子计算机对电网运行状况进行监控。
- C.Many switched to electric heaters, overloading the power grid. 许多家庭开始使用电加热器,造成电网超负荷运作。
- The Hubei electric grid as an example provides for calculating and veribying, which provides the reference to the power grid dispatcher and substation operator. 并以湖北电网为例给出了算例进行验证,以供电网调度与变电站运行人员参考。
- An area in North China power grid, the territory has a 110 kilovolt power transmission stations 1 and 35 kV power transmission station 3, the rich energy supplies, low prices. 电力属华北电网区,境内拥有110千伏输变电站1座和35千伏输变电站3座,电能供应充足而富有,电价低廉。
- Mainly of three - phase structure, good for power grid balance and mass usage. 以三相结构为主,有利于电网平衡和批量使用。
- Wang xiaocan, director of Tian Jia An Power Plant and manager Sun Hongtao visited Cilacap Power Plant on Nov 19, 2008. 2008年11月19日中国大唐淮南田家庵发电厂王晓灿厂长以及孙洪涛总经理不远万里来到印尼芝拉扎电厂对援外的职工进行慰问。
- Another threat to electricity supply comes from the power grid itself. 电力供应的另外一个威胁则来自于电网本身。
- The instable voltage of power grid shortens the service life of street lamps. 电网供电电压不稳定,致使路灯的使用寿命缩短。
- The suggestion for the innovation on Xiangfan power grid was put forward. 提出了对相关电网的改造建议。
- The operation result from Yan"an Power Plant shows that it is quite suitable for the control of ball mill coal pulverizer and a large amount of electric energy is saved. 在延安发电厂的运行结果表明,该控制策略对球磨机的控制行之有效,节能效果显著。
- Once when the local power grid failed,Young recalls,the rain forest shot from 85 to 120 degrees F in just 15 minutes. 扬回忆到,本地的高压输电网曾经无法正常运转,结果热带雨林的温度在15分钟之内从华氏85度窜升到120度。
- Meanwhile, a southern power grid company based on local assets will be established. 同时还将成立以地方资产为主的一个南方电网公司。