您要查找的是不是:
- In the process of overturning stability analysis of counterforted buttressed quay wall with crane rail bearer,we shall consider the stabilization moment caused by the force of cutting pile. 设置桩支承的起重机轨道梁的扶壁码头结构形式,抗倾稳定性影响分析中应该考虑截桩力的稳定力矩。
- In the process of overturning stability analysis of counterforted buttressed quay wall with crane rail bearer, we shall consider the stabilization moment caused by the force of cutting pile. 摘要设置桩支承的起重机轨道梁的扶壁码头结构形式,抗倾稳定性影响分析中应该考虑截桩力的稳定力矩。
- The paper introduces the British standards that were applied during the construction of Layyah Block Quay Wall Project, Sharjah, UAE and their comparison with relevant current Chinese standards. 摘要介绍了阿联酋沙迦雷亚码头改造项目所执行的英国施工标准,并与中国施工标准进行了比较,说明了英国施工标准的要求和特点,并阐述了为达到该标准所采用的施工工艺。
- Based on dimensional analysis, a number of dimensionless groups that governed the performance of the quay wall were investigated, identified and used to design and interpret centrifuge model tests. 基于模拟挖掘机开挖沟槽的离心模型试验结果,建立沟槽槽壁许可破坏模式及速度场,利用极限分析上限法求解开挖深度上限解。
- The city's arcaded quay was built by the French, whose 132-year rule of this North African land ended in 1962. 这座城市的拱廊码头是由法国人建造的,法国曾统治这个北非国家132年之久,直到1962年为止。
- relieving platform type of quay wall 桩承台式岸壁
- quay wall of sheet pile with barrier pile 遮帘式板桩码头
- The shutters thumped the wall in the wind. 在风中百叶窗砰砰地碰在墙上。
- There used to be a small hotel on the quay. 码头上曾经有个小旅馆。
- The picture on the wall is crooked. 挂在墙壁上的画是歪的。
- We tied (the boat) up alongside the quay. 我们把船停泊在码头处。
- The medieval town was fortified with a high wall and a deep moat. 这座中世纪的城市周围建有城墙和护城河。
- Analysis of Stressing patterns of Submerged Large-diameter Quay Wall 对沉入式大圆筒结构岸壁受力状态的分析
- He shored up the wall with a thick balk of wood. 他用一根粗大的木头把墙撑住。
- I can't get this screw to come out of the wall. 我无法把这颗螺丝钉从墙上取出。
- The baby daubed up the wall with his crayon. 小孩用蜡笔把墙上画得斑斑点点。
- There is a map of the world on the wall. 墙上有张世界地图。
- There is an ornament made of shells on the wall. 墙上有一个贝壳做成的装饰品。
- They were pinioned against the wall by the lorry. 那辆卡车把他们挤到墙根动弹不得。
- FACTOR ANALYSIS FOR BACK INCLINE OF GRAVITY CONCRETE BLOCK QUAY WALL 重力式方块码头后倾因素分析