您要查找的是不是:
- Insert known good CD and test operation. 插入已知好cd并测试操作。
- Chengdu Chengbang Dynamic Test Apparatus Co., Ltd. 成都诚邦动力测试仪器有限公司。
- Static and dynamic test methods for port cranes me. 港口起重机金属结构静载及动载试验方法。
- Purpose: To test operation of pressure differential relief valve. 目的:检测压差安全阀的运行。
- Finally, OMC platform is evaluated through test operation. 最后对OMC平台进行了试运行测试。
- Rescue boat davit (life raft davit) to be done dynamic test. 救助艇架(救生筏吊架)动负荷试验。
- The level force interacting with shaft passages during operation of cage is testedwith advanced hoh-electric dynamic test method at home and abroad. 利用国内外先进的非电量动态电测法,测试提升罐笼在提升运行过程中与井筒罐道相互作用的水平力,大大提高井筒装备行的安全性。
- Allow temperature of vehicle interior to stabilize and test operation. 让汽车内部温度稳定并测试操作。
- Performs daily inspection and testing operation. 完成日常检查及测试工作。
- How static and dynamic testing differ? 静态测试和动态测试有何不同?
- Use both static and dynamic testing. 静态测试和动态测试相结合。
- This algorithm has been used in the dynamic test system of HJD-28 digital SPC. 采用本文介绍的测试算法设计的测试诊断程序已实际用于 HJD-28用户程控交换机的动态测试系统中.
- In order to reduce the operation cost,a small dynamic test was done with the simulation of the operation conditions of the aeration basin,and calcined soda is being replaced by limewater. 为了降低运行成本,采用小型动态实验,模拟曝气池的运行条件,将石灰水代替纯碱以中和水质。
- This parameter specifies the amount of time to wait per connection, in seconds, for the test operation to finish. 此参数指定每个连接等待测试操作完成的时间长度(秒)。
- Assist on training new test operator and technician. 协助培训新的测试作业员和技术员。
- The level force interacting with shaft passages during operation of cage is testedwith advanced hoh-electric dynamic test method at home and abroad.It can lift the shaftequipment safety. 利用国内外先进的非电量动态电测法,测试提升罐笼在提升运行过程中与井筒罐道相互作用的水平力,大大提高井筒装备行的安全性。
- This parameter specifies the amount of time to wait, in seconds, for the test operation to finish. 此参数指定等待测试操作完成的时间长度(秒)。
- In the inspection and test operation, the withdrawable part is to be moved with the crank fitted. 通过检查和试验操作,通过手柄摇动手车应轻便灵活;
- Test all the electric and electronic parts of the system before test operation of the whole system . 在试运行之前请对系统的所有电气和电子组成部分按照说明进行测试。
- The systematic hydrostatic test (dry run, hot test, dynamic test, actual start-up ) is scheduled for next Monday. 系统水压试验(学习、加热试验、动力试验、实际开车)定于下星期一进行。