group pole foundation
英
美
- 群桩基础
group pole foundation的用法和样例:
例句
- Furthermore, a mass of numerical calculations of the internal force of pile group under different magnitude and obliquity loads is made by the program.
此外,采用本文程序对不同荷载量级及倾角下群桩基础的内力进行了大量的数值计算。 - The bored pile-group is used for the foundation of the main pylon piers and a drilling platform will be used as temporary facilities for construction of the pile foundation.
主塔墩基础采用钻孔灌注桩群桩基础,采用钻孔平台作为桩基施工临时设施。