您要查找的是不是:
- Eco. Green Space System Planning. 生态绿地系统规划.
- Responsible for quality management system planning. 负责质量管理体系的策划。
- Responsible in MIS system planning and executions. 负责信息系统的规划和建设;
- A deliverable of the planning phase for a development project. 开发项目的计划阶段的可交付件。
- The master project schedule is a deliverable of the planning phase. 主项目时间表是计划阶段的可交付件。
- The flow is linear, with some iterations in the planning phase. 过程流程是直线的,在计划阶段会有一些迭代。
- After you've completed the planning phase, you can begin the design process. 完成规划阶段后,即可开始设计过程。
- Do I get a copy of the reduced system plan when I play? 当我投注时,我可以有一份聪明包牌法的计划吗?
- Study of the communication system Plan for a new power plant. 新建电厂通信方案的探讨。
- If you need to take snapshots of extensive project data during the planning phase, save multiple baselines. 如果在计划阶段需要对大量项目数据执行快照,可以保存多个比较基准。
- If your form template will only be used by members of your immediate team, the planning phase may be very informal. 如果表单模板将只由直接团队的成员使用,则规划阶段可能非常不正式。
- We've provided a few Q&A highlights to get you through the planning phase and hook your racing hearts on the Himalayas. 我们提供了一些问答集锦,来帮助你完成你的计划,保证你心系喜马拉雅。
- In this dissertation, product system planning and mass integration of an EIP are researched. 本文的研究内容是生态工业园区规划研究的一个方面,主要包括产品体系规划与物质集成。
- Therefore, during the planning phase, devote adequate time in defining the role of the reviewers. 因此,在规划阶段,应投入足够的时间来定义审校员的角色。
- It is important to understand these changes at the planning phase so that they can be implemented during the storage and replication design. 需要在规划阶段了解这些更改,以便在设计存储和复制时实施这些更改。
- Tne Planning of tree and shrub species is an important component in park and green space system planning of cities. 树种规划是城市园林绿地规划的一个重要组成部分,是园林绿化事业带方向性的基础工作之一。
- Trouble often stems from a project life cycle with just a design phase. Make sure it contains a design and plan phase! 问题往往来自项目生命周期只有一个设计阶段,确保项目的生命周期包括了一个设计和计划阶段!
- The case study illustrates that the model can satisfies the requirements of the hydropower system planning. 实例证明该模型对于水电站群的组合方式没有限制,适合求解大型的水电站群规划。
- Even if your company does not follow a formal methodology, the proper approach to the planning phase begins with these first steps. 即使您的公司并不采用正式的方法,规划阶段也应首先执行这些步骤。
- Finally, the product system planning is obtained according to the present resource and technology in the EIP. 最后根据园区企业现有的资源和技术水平给出产品体系规划。