您要查找的是不是:
- Lift retainer and check assembly from valve body. 从阀体内取出护圈和止回阀总成。
- Air - tightness testing of the main valve body assembly on 120 - 1 air control valve for freight car 120-1型货车空气控制阀主阀体组成气密性检测
- Remove the body bolts from the valve body. 从阀体上拆卸阀体螺栓。
- Install new retainer module assembly into valve body by aligning "U" shaped cutout in retainer with the valve outlet. 通过对齐护圈上和阀门出口的"U"形切口,将新的护圈模块总成装配到阀体内。
- Remove the bolts and cover, realign the diaphragm assembly, and place the cover back on the relief valve body. 拆卸螺栓和阀盖,重新校准隔膜总成,并将阀盖放回到安全阀阀体上。
- Screw the cover onto the valve body. 将阀盖旋在阀体上。
- Kits include: Rubber Disc, Piston Diaphragm Assembly, disc retainer, Relief valve body O-ring. 组件包括:橡胶阀瓣,活塞隔膜总成,阀瓣固定器,安全阀阀体O形环。
- Turn handle to be perfectly perpendicular to valve body. 将手柄旋转到与阀体完全垂直的位置。
- Remove the body bolts from valve body using Allen Key. 采用内六角扳手从阀体上拆卸阀体螺栓。
- The key problems and solution of fuel body assembly of missile engine by using EBW are introduced in the paper. 介绍了电子束焊接某型导弹发动机燃料壳体组件的技术要求及工艺措施。
- Installation suggestion: valve body vertical and upward. 建议安装方式,阀体垂直向上。
- IMPORTANT! Flow must always be in direction of arrow on valve body. 重要提示!水流流向必须与阀体上的箭头方向一致。
- Insert valve body through mounting hole and seat lugs. 将阀体插入安装孔和密封连接盘。
- Press stem/ball into valve body and remove from open end. 将阀杆/球体压入阀体内,并且从开口端卸下来。
- The top of retainer must drop just below threads in the valve body. 护圈上方必须放置在阀门阀体螺纹以下。
- Slide one half of the splash guard into the groove on the relief valve body. 将防溅保护的一半滑动到安全阀阀体的沟槽上。
- Firstly, during the research of the testing andinspection system of the throttle body assembly, the aerodynamics is used ,thecontrolling strategy and communication protocol of ECU are contacted foracquiring and transferring data. 首先,在节气门体总成检测系统的研究过程中,要运用到气体动力学,还要结合控制单元(ECU)的控制策略、通讯协议进行数据采集、传输;
- Install valve in the direction of the flow arrows on the valve body. 按照阀体上的箭头方向安装阀门。
- Assigning the ideally fitted wedge, ground and lapped, to proper valve body. 将研磨后的楔板分配到最适合的阀体上。
- Reinstall the valve body and union nuts only after the joint has fully cured. 只有在连接完全成功粘固后,才能够重新安装阀门阀体。