您要查找的是不是:
- The Benefit Comparison Between Oust-in-site Pile of Manpower Boring and Driven Precast Pile 人工挖孔灌注桩与锤击预制桩的效益比较
- driven precast pile 打入式预制桩
- Under the engineering geology conditions in Wuhan, the superiority of precast pile is discussed. 针对武汉地区工程地质条件,论述了预制桩推广应用的优越性。
- Prestressed pipe pile is a precast pile, which has many merits, such as high bearing capacity, high degree industrialization and convenience construction, and it is widely used in engineering now. 摘要预应力管桩作为一种预制桩,具有单桩承载力高、工业化程度高,施工快捷方便等优点而在工程中得到推广应用。
- The deflection of precast piles and excavation problems induced by pile driving are introduced through an engineering case of pile foundation treatment of a power plant. 通过某电厂桩基处理工程实例,介绍了打桩引起的预制桩偏位及开挖问题。
- Inquire into Short Time Effect of Precast Pile 预制桩短期时间效应的初步探讨
- Test of precast pile and closing of break defect 预制打入桩断桩的检测及其处理
- Static jacked precast piles have many advantages, such as no vibration, no pollution, lower price and better quality, etc. 摘要静压预制桩具有无振动、无污染、造价低及质量可靠等优点。
- the static pressure precast pile 静压桩
- This paper describes the design and construction of the demolishing scheme of the high-piled wharf, and analyzes mainly the demolishing scheme of precast piles under rocky coast. 介绍高桩梁板码头拆除方案的设计及施工,重点分析岩质海岸地质条件下预制桩的拆除方案。
- Design and Construction of Static Pressure Precast Pile Foundation 静压预制桩基的设计与施工
- Application of precast pile in a certain bracing of foundation pit 预制桩在某基坑支护中的应用
- I've never seen a car being driven so recklessly. 我从没见过有人开车这么卤莽。
- How can I drive away these feelings of sadness? 我该怎样做才能驱散忧伤?
- Bill wave his hand to us and then drive away. 比尔向我们挥手告别后开车走了。
- The engines are driven by steam. 这些发动机是由蒸汽驱动的。
- The machines are driven by electric motors. 这些机器都是由电动机驱动的。
- ON PARTIAL FACTORS OF LIMIT BEARING CAPACITY OF PRECAST PILE IN SHANGHAI CODE 上海标准推荐的预制桩极限承载力分项系数研究
- He was driven crazy by the extremity of pain. 极度的痛苦使他发狂。
- He was almost driven out of his mind with anxiety. 他焦急得差不多精神都错乱了。