Through calculation and dynamic adjustment of the distribution factor for every power plant and tie line, more accurate load flow change can be obtained. 通过计算并动态调整各个调节电厂和联络线的调节分配因子,得到比单个松弛节点计算时更加实际的潮流变化。
In the protocol, multiversion optimistic concurrency control method was adopted.Technique of multiversion dynamic adjustment of serialization order was used. 协议采用多版木乐观方法,使用多版本动态调整串行次序技术。